From $9.95


Statistics

Users
Total: 32,911
Visited Last 30 days: 203
Forum Messages
Total: 20,966
Last 30 days: 7
Forum Evaluations
Total: 24,160
Last 30 days: 0
Journal Entries
Total: 5,400
Last 30 days: 7
Connections
Total: 15,247
Last 30 days: 4
Downloads
Total: 87,221

Journals

Name
NorthShoreBathrooms
12 Visits | 1 Posts | 2 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
601 Visits | 5 Posts | 4 Pix | 0 Videos
furnacerepairon St Catharines, AL
35 Visits | 1 Posts | 9 Pix | 0 Videos
furnacemkm Markham, AL
38 Visits | 1 Posts | 7 Pix | 0 Videos
vallejocleaningservi... Vallejo , CA
35 Visits | 1 Posts | 1 Pix | 0 Videos
getpestcontrol Delhi, AL
39 Visits | 1 Posts | 1 Pix | 0 Videos
noithattrieugia tphcm, AL
54 Visits | 1 Posts | 0 Pix | 0 Videos
httpownerbuilderbook...
121 Visits | 1 Posts | 0 Pix | 0 Videos
Packers-and-Movers Delhi, AL
380 Visits | 2 Posts | 1 Pix | 0 Videos
Best-Access-Doors Jackson, AL
170 Visits | 1 Posts | 0 Pix | 0 Videos
Concrete-Contractors...
232 Visits | 2 Posts | 0 Pix | 0 Videos
bird Springfield, MO
169 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
120,420 Visits | 1,004 Posts | 2,581 Pix | 47 Videos
Drywall-Repair-Lehi
247 Visits | 1 Posts | 0 Pix | 0 Videos
ianpundt
285 Visits | 1 Posts | 0 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
607 Visits | 2 Posts | 2 Pix | 0 Videos
httpswwwfaxitfastcom... salt lake city, AL
252 Visits | 1 Posts | 0 Pix | 0 Videos
Owning-My-First-Prop... Grand Rapids, MI
361 Visits | 1 Posts | 0 Pix | 0 Videos
movers-and-packers Hyderabad, AL
353 Visits | 1 Posts | 1 Pix | 0 Videos
Investment-Propertie... Rochester, MN
403 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

I am so thankful for this forum and website.
Angela in Luray, VA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.
25,000 pages of free owner-builder resources.  We accept no ads.

Help!!! Excavation/Foundation


Filter by date: and/or Keyword



Reply... Subscribe to this topic


Paula's Forum Posts: 60
Interview Answers: 14

Private Message


Randomly Selected Image

Login to Vote

By Paula in Fredericksburg, VA on 8/27/2006


WARNING! Long email.

I need some help from all of you.  I am still having a difficult time understanding the excavation/foundation part of the house.  Once I am at the framing level, I'm good but I am beginning to worry about my ability to get past the foundation.

My foundation is a stem wall with slab.  This is not the original property that I had in mind for my plan and the property is not perfectly conducive to a monolithic slab.  Hence, the stem wall.  The property has about 4 feet of fall from the back to the front of the house. House corners are already staked.

My understanding of the excavation/foundation process:

  • locate utilities and mark
  • install silt fence and construction entrance; lay crusher run
  • mark trees and clear all trees and stumps ensuring no organic material remains within the footprint of the home.
  • clear top soil from foundation area and driveway; clear area 2-3' beyond footprint for access
  • grade lot for proper drainage: lot should have a 6" slope within 10 feet of the house and 1-2 feet of fall from house to street
  • dig depth of foundation as necessary (how do I determine??)
  • compact soil in foundation area
  • dig footers as per foundation plan
  • footers inspected
  • pesticides applied
  • footers poured
  • poly vapor barrier laid
  • foam insulation??
  • concrete block for stem wall laid (how do I determine height-number of courses)
  • rough plumbing (sewer pipes, etc), HVAC and rough electrical laid. (pipes that will protrude from concrete should have steel sleeves foam protection)
  • Inspected
  •  Within the concrete block perimeter, fill in foundation area with gravel and stone
  • 4" slab poured; chairs used to hold rebar in place
  • pour patio and front steps
  • install 4" plastic drain pipe (perf) around perimeter of foundation with gravel below and 8-12" above; pipe should slope about 1" every 20' all to one corner; tar paper on joints
  • apply backfill
  • cut driveway
  • final grading with remaining topsoil

How confused am I?  What am I missing and/or confusing?
I know this is pretty long so I really appreciate any help you guys can give me.  Thanks!

Paula

 