From $9.95


Statistics

Users
Total: 31,149
Visited Last 30 days: 144
Forum Messages
Total: 20,771
Last 30 days: 9
Forum Evaluations
Total: 24,154
Last 30 days: 0
Journal Entries
Total: 5,297
Last 30 days: 12
Connections
Total: 15,167
Last 30 days: 4
Downloads
Total: 82,474

Journals

Name
Tanglewood Colorado Springs, CO
113,685 Visits | 954 Posts | 2,486 Pix | 42 Videos
The-Last-Rodeo Angel Fire, NM
24,072 Visits | 266 Posts | 426 Pix | 4 Videos
Z-Oen Dayton, OH
4 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
676 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
63 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
54 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
69 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
108 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
135 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
868 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
172 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
152 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,322 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
169 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
254 Visits | 1 Posts | 0 Pix | 0 Videos
Metal-Buildings Conroe, TX
355 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
320 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
405 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
500 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,637 Visits | 40 Posts | 177 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
James in Beaumont, TX0.002
Timmy Weeks0.001
Steve0.002

I, for one, REALLY appreciate everything everyone on here has been teaching me through documenting their experiences.
Grant in Jacksonville, AL

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.
25,000 pages of free owner-builder resources.  We accept no ads.

Average time to complete plans


Filter by date: and/or Keyword



Reply... Subscribe to this topic


Tavis's Forum Posts: 6
Interview Answers: 63

Private Message


Randomly Selected Image

Login to Vote

By Tavis in Stevensville, MT on 2/25/2007


We are in the process of having a designer modify an existing floorplan (adding a few hundred sq ft). I'm curious how long most draftsman take to actually complete a set of plans (once the design is complete)?
Reply...

2007 Merit Award Winner

Dale's Forum Posts: 380
Interview Answers: 59

Private Message


Randomly Selected Image

Login to Vote

By Dale in Richland, AZ on 2/25/2007


Being in the business, once the floor plans and elevations are designed and approved, I schedule a due date on a set of plans of no more than six weeks out. I suspect that depending on local scenarios this could be shorter or longer. realistically a set of plans for the typical house should take less than 100 hours of actually productive time (and that is being liberal for semi-skilled drafts people). But that should include all the sheets of plans......site, floor, foundation, framing, elevations, sections, plumbing, mechanical, and electrical. But be aware that a minor change to the floor plan can affect every page in the plans, even if done in CAD. And changes can be a real pain to do and very time consuming to fix if done late in the drafting stage of construction documents.

I would rather spend an extra two weeks in design than have to go back and make "one" alteration to the floor plan once construction documents are in progress.

Reply...


Tavis's Forum Posts: 6
Interview Answers: 63

Private Message


Randomly Selected Image

Login to Vote

By Tavis in Stevensville, MT on 2/25/2007


Excellent, thanks for the speedy reply. On this same note, the draftsman/designer that I am using does not use CAD. Do draftsmen that use CAD typically finish the plans any faster than one that does not?

Also, the designer mentioned that we don't have to necessarily use him to complete the plans (after he is done w/ the design, is that a bad idea to use someone else?


Reply...

2007 Merit Award Winner

Dale's Forum Posts: 380
Interview Answers: 59

Private Message


Randomly Selected Image

Login to Vote

By Dale in Richland, AZ on 2/25/2007


Personally I prefer to do both the design and drafting. But have done many drafting projects off someone else's design. but I always give my 2 cents worth of input based on my experience.

In CAD the hardest part is getting the floor plan into the program, and some things that can be faked by hand can't be on the computer. Other problem I run into frequently in this situation is the designer not taking material modules into consideration. Sometimes a 22' wall in length is cheaper to build than a 21' wall. Or you need a 6x6 post under a beam in a 4" frame wall. Or how can the heating ducts run through that space?



Reply...



Reply... Subscribe to this topic