From $9.95



Syndication

Statistics

Users
Total: 31,991
Visited Last 30 days: 109
Forum Messages
Total: 20,875
Last 30 days: 6
Forum Evaluations
Total: 24,158
Last 30 days: 0
Journal Entries
Total: 5,349
Last 30 days: 2
Connections
Total: 15,216
Last 30 days: 1
Downloads
Total: 85,219

Journals

Name
Tanglewood Colorado Springs, CO
117,013 Visits | 986 Posts | 2,544 Pix | 45 Videos
The-Last-Rodeo Angel Fire, NM
25,901 Visits | 271 Posts | 435 Pix | 4 Videos
E2custom
310 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
370 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
49,686 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
410 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
374 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
410 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
2,110 Visits | 34 Posts | 52 Pix | 0 Videos
Vintage-Oaks-Cabin New Braunfels, TX
776 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
541 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
1,332 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
589 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
613 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
627 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
612 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
652 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,383 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
692 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
606 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Sally0.001

We're just getting started in the owner-builder process so we're still greenhorns but learning a LOT!!!  This book has been very enlightening and inspiring.
Lee in Schertz, TX

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.


TC's Forum Posts: 8
Journal Entries: 63
Interview Answers: 70

Private Message


Image from TC's blog

Subscribe to this journal...



This journal has been viewed 7307 times.



Newest << >> Oldest


Posted to 697-Marlin by TC in Austin/McDade, TX on 3/8/2014 2:34:54 PM

BURR, last week was a cold one

Photos

no jumpers rented this during this time
and no I did not ride the bike that morning



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/8/2014 10:40:58 AM

putting the plastic on the foundation and working inside the "barn" up the hill Lowe's installed carpet

Photos

Lorie looking at all the pipes
plumbing covered
look closely, see the trench....just needs steeal
inside the red "barn"
upstairs looking at the stairs
and the other way
Lowes installers, were fast
that is a hatchet



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/1/2014 9:24:36 AM

moving along Casa Plumbing was out yesterday and they ROCK....


They had plans for all the location of fixtures and pipes....I need to go out to double check but on a glance it looked correct


Now to get American Concrete back for the trenches and steel work

Photos

had a little rain
I want one...lol
makes quick work on digging trenches
Casa plumbing....man were they fast
noon to about 6 and DONE
looks like a mess, would have taken me a month, took them a day



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/1/2014

Wake up in the morning...and this is my view

Photos

best guess of the pending view



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 2/26/2014 9:28:45 AM

foundation continues with putting up boards and fixing the issues from the last contractor that walked off (out of square, too far out on the sides) not enough steel in the lower end(shorter walls) (((pictures reserved for pending suit)))


Fill needed was beyond what I was figuring, I was guessing about 200 yards, looks more like 350(about 30 trucks) total..

Good thing I am paying turn key not cost plus

When I left on Tuesday the property, they were waiting on the last 2 trucks and it was after 4.

American Concrete seems to be rocking along.



Photos

setting the outside boards
looking good, hard point pads were poured for collums
6 loads of fill dirt waiting
the bagging starts along the wall,
center filling up
looks good, lots of fill down, much more comming



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 2/22/2014 12:30:06 PM

well.....after reviewing the bid, contacting 6 references, checking the BBB and online, looks like I goofed.



Our foundation contract said $15K down, balance on completion,  he poured the footers then with out any other notice sent me a invoice for another $15K

When I called him I was informed that he put many bids out and it must have just forgot to add the line for another $15K after the footers were done (he sounded a little shocked that I would not just cut him another check).

He then informed me that I could pay for the upcoming concrete and more fill and just give him a check for $5K.....??????

I had a picture of the truck that delivered and called Austin Ready Mix several days later and was informed that the check was written incorrectly and could I come in and pay the amount owed?...NO, that is up to Larry to pay or you can turn over to the DA for hot check as far as I was concerned.(yes I know, lien on property issues)

The good news is that he did drop off about $9K worth of re-bar for the foundation on the property so we are able to use this to continue the construction.




Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 2/21/2014 6:51:27 AM

Been some activity on the last 2 weeks, we had the foundation footers poured and had a HARD freeze(check out the fountain) 


Photos

1st bit of concrete for the footer---YEA
and the flow starts
YEA
Austin Ready Mix trucks look nice
FOOTERS



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 2/5/2014 6:39:10 AM

Foundation is moving along, there is lots of re-bar going in and up. 


It is to be COLD the next few nights so not much is planed except put in LOTS more re-bar and get ready for the walls.

Photos

footer for internal post under the slab
Let the sparks fly, nuff said
footer for south wall again showing the out of level property
view from the storage building(guest house)
all the center post points and the wall re-bar going up



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 2/1/2014 6:00:01 AM

1-30/31


Not much on the house site, waiting on the plumber to sleeve the footers

did get the new driveway down and smoothed out, Lorie did some of the work on the kabota

Photos

Drive area marked for delivery
Delivery, load # 2, 12 yards covers about 50-80lf for new drive
Lorie using Kabota to smooth and level drive
drive down



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 1/31/2014 8:50:50 AM

1-29-14

They have the footers dug and there is some loads of fill delivered


Photos

Lorie fell in the footer the horizontal board over her head will be the base of the foundation
Looking east on the property to the tank
footers and pile of fill FYI, tree line is about property line
looking down from the drive,



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 1/29/2014 10:09:04 AM

MONDAY 1-27-14: Cold 40 ish
The baton boards go up for the foundation layout. Look closely on the left, that top board is the top of the foundation and there is a string going to the corner left, the string represents the top of the foundation.
 
TUESDAY:
Freezing and icy roads kept the crew from working on the foundation, but JC (Gravel) will have some road base available soon for the drive.
 
                                            WOW.
8 foot foundation is taller when looking at it on the property verse just talking about it.       

Photos

before starting looking up the hill at the home site(white pickets)
baton boards going up, looking down the hill



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 1/24/2014

Here are pictures of the property:

Photos

Fog in the morning, looking to the location the house will be
Look close, 4 white posts in the center, that is the location of the house



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 1/24/2014

Here we go...


The plan is to start the foundation this month on the 27th, I will be using Larry White with affordable concrete here in Austin to do the foundation.

((UPDATE--- do not use Larry White. Please read post 2/22/2014  before using him))

Casa for the plumbing.

As for framers and the rest of the trades, that is undecided as of this time, hope to lock them down soon.

Photos

The idea


Files




Comments (0)
Private Message


Newest << >> Oldest


Copyright 1997-2019 Consensus Group Inc.