From $9.95



Syndication

Statistics

Users
Total: 32,071
Visited Last 30 days: 114
Forum Messages
Total: 20,878
Last 30 days: 3
Forum Evaluations
Total: 24,158
Last 30 days: 0
Journal Entries
Total: 5,362
Last 30 days: 5
Connections
Total: 15,223
Last 30 days: 7
Downloads
Total: 85,575

Journals

Name
Tanglewood Colorado Springs, CO
117,516 Visits | 999 Posts | 2,572 Pix | 47 Videos
The-Last-Rodeo Angel Fire, NM
26,041 Visits | 271 Posts | 435 Pix | 4 Videos
E2custom
458 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
427 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
49,746 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
458 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
421 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
457 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
2,176 Visits | 34 Posts | 52 Pix | 0 Videos
Vintage-Oaks-Cabin New Braunfels, TX
820 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
589 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
1,381 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
647 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
657 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
676 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
655 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
704 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,420 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
729 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
654 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Sally0.001

We are owner-building because it's a challenge and the potential payoff/self-satisfaction are immense.
Bob in Parma, OH

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.


TC's Forum Posts: 8
Journal Entries: 63
Interview Answers: 70

Private Message


Image from TC's blog

Subscribe to this journal...



This journal has been viewed 7346 times.



Newest << >> Oldest


Posted to 697-Marlin by TC in Austin/McDade, TX on 4/20/2017 1:49:31 PM

Been a long while, and life has pulled me away for the journal. but I will update with pictures soon.


Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 8/4/2016

Porch, fish tank, and sauna are all projects being worked on this week, porch ceiling is a wet area drywall, and when painted should be fine. Now that the glass has been installed for the sauna, we hooked up the heater and light. Very relaxing at night. Fish tank has a 120-gallon sump that had to be placed in the closet first, then the platform was built from 2x6 and plywood, before we could place the main 200-gallon tank in the opening. This took four people to raise and install the tank as there was 2" total on the side to spare and even less at the top, tight fit. At eight pounds per gallon of water, the tank weighs in at about 1,600 lbs., more that the weight of some cars. Add in the sump we are at 2,400 lbs. in a 18 sq. ft. area. This is a lot of weight and we had the slab designed for this item.

Photos

The deck is getting a ceiling.
Looking good
Sauna glass
Master shower
Yep, we have heat in the sauna.
Looks great
Fish tank going in
From the front
Sunrise



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 7/25/2016

Septic, kitchen backsplash, closets, and sauna; a little bit of several things.

Photos

Septic looking back at the house
Looking down at the septic from the corner of the main deck
Upper deck looking down at that toy
Leach field, four runs of 70-ft. 4" pipe
Trenching up to the tank, about 300-ft. down to the leach field.
Tie in to the house
Start of the backsplash
Over the stove
Bed two closet
Bath two shower system
Installing the glass wall for the sauna
From the shower you can enter the sauna.
Looking down
Master shower system



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 7/22/2016

After the painters walked... with most of my money... should have known better but I trusted the person... the girls went ahead and stained the stair railing and painted the balusters, looks good. They installed the upstairs carpet, doors were hung upstairs, and the baths were finished with toilets and sinks.

Photos

Couches with the Turkish rug
Delivering the couch for the media room
The girls goofing off after the delivery
Build out of the stairs....the 5th step down was a long step
and all the way down, need rails
Rails and blisters up
Couch, carpet on the loft
Living room, from the loft
Media room with spiral stairs in the corner



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 7/22/2016

Kitchen counter install happened earlier this month, just been unable to spend time updating the journal... sorry the granite is a gray and white, Lorie and I picked out the slabs earlier this month and got with the installers to lay out the kitchen on the slabs to take advantage of some interesting patterns in the material for the main island (28x86 inches) and the breakfast table (38x98 inches).

Photos

They used the porch to cut out the sink and fine tune the slabs.
The delivery truck
Polishing the sides
Install
By the sink
On the pass through
Cutting the media room sink
Island sink
Working on the island...look at that breakfast table!



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 6/23/2016

Pictures that I wanted added to the journal: painting, flooding and others.

Photos

I wish this was mine...nope, the neighbors and it looks great.
Living room floor after tile added
One reason I am delayed in posting: there was three 100 year rains this spring and caused us to run behind.
We have propane, 500 gallon tank
the painter starting to paint the "barn".
Yep, barn red
Home Depot, mixing the color
Dormers painted
And the Master bath window
Living room side of the house with the porch railing installed
HOG panel makes a wonderful railing for the country... might not look as good in Manhattan.
The view from the porch with the railing
Living room stairs
In progress
Far shot from the bottom of the hill (still our property; see the little red building in the background on the left?)
Look at that view of the rainbow!
This is the view from that little red building looking at the sunrise on 6-19-16 @ 6:51AM
The front door stained by Tara



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 6/23/2016

Bath floors all got the pebble rock; the crew was able to install it in one afternoon. The installation consisted of mixing the rock with a two-part epoxy and troweling it down,

Photos

Installing the pebble stone floor, this is an epoxy-coated stone that is troweled down to about 1/2 inch thick.
Pebble stone floor
Rock floor looks GREAT, some issues with the level of the stones and the slope and fall in the shower, I will wait and see.
Master bedroom (yep purple wall in here)
Master bath floor
Sauna through the shower in the master bath
Sauna looking good
Back tub being installed



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 6/23/2016

Kitchen pictures:

Photos

Freezer being installed (this was the first freezer, as it was bad and had to be replaced.)
Pantry corner for the freezer
Tight squeeze to put it in there
Kitchen parts ready to be installed
Kitchen install in progress
WOW, 48" stove (still needed to be converted to propane)
Do not worry, it is electric stove...lol
Kitchen almost ready for countertop
Using www.xkglow.com lights, I can choose any color for the kitchen....YEP, there is an app for that.
Here it is in green



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 6/23/2016

It's been a while; I've been very busy with work and the building; we are now about two weeks to being finished and moving in. And not a moment too soon. The HVAC is installed, plumbing was finished up to the sinks that have not been installed, all toilets, tubs, showers, and outside faucets are done, now to the kitchen countertop, and wall tile, carpet, and finish paint touch-up... oh, and the septic tank.

Photos

Sauna delivered
Sauna
WOW that is a red wall
And a blue wall
Goofing off in the green room
Tara wanted a lift
Flooring in the living room



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 4/5/2016

Inside paint is done, yes we did it a little differently than some by having the final paint on the walls before trim but we kept back a quart of paint in just about each room for the trim painting, we shall see if this was a good choice or bad in about two months.

Photos




Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 4/4/2016

Over the last few weeks I have had three bids for painting the inside, they have ranged from $13K to $18K plus paint. At that price I decided I would paint the house myself and acquired a spray painter and started painting the house myself and was going to have the trim painted by a pro. After just a few hours with the sprayer, I ran into Elgin to Parker Lumber, while there I picked up a card for Painter Oscar (512-801-9550) and he came out the next day to look. He agreed to paint the inside for half of what others were wanting and one-third for the outside... YEP, he got the deal... In four days he painted the entire inside, minus the trim that has not been installed, and we pulled away one quart of paint for each room to ensure a correct color match after the trim is installed (we hope). While he was painting, I was able to get the decks for the two drop-in tubs built and ready for the tile guys to lay tile. That is to start on Tuesday April 5th. They say two weeks to install four bath walls, and 2,500 sq. ft. flooring. The electrician will start on the 18th. Strange colors were only painted on one wall per bedroom.

Photos

Me painting.
Yes, I did get more on the walls.
Oscar, the PRO painter.
His dad.
My, that is a blue wall for my office.
The kids' room.
Lazy Lizard, is THAT room.



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/28/2016

The drywall company brought out this GREAT scissor lift and were VERY nice to let me use it over the weekend to paint the ceiling, put in can lights and wash the windows, as the upper windows are 22+ feet up, this might be the last time they are EVER cleaned... Someone said it is a good thing I was not afraid of heights on that lift... I informed them that I am not afraid of heights, just of tall shaking things that might make me fall or are very tall.

Photos

Me painting
The before
Look at the wall, not the idiot.
The fireplace is several shades darker than the walls.
Looking good
The after
The walls on both sides are the same color, just a lighting issue.
Putting up can lights
Back row can lights, that is about 20 feet off the very hard floor.



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/28/2016

The garden has been tilled over the last several months, and is ready for planting, and as you can see some planting is ongoing... We are using plastic mulch with in-ground drip irrigation under the plastic mulch. The equipment cost some $ but at my age, it will remove a lot of the hoeing to remove the weeds from the garden.

Photos

The row maker makes 4-6" high rows that are 24" across.
Two beds of the aquaponics
Ready for planting
Taken March 15th, we have squash.
Garden with row covering



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/23/2016

It took longer than the week to mud and texture the walls, but it is finally done. The tape and float took the bulk of a week and a half due to the size of the house. every day the crew of four drove up from Houston to McDade (over two hours), to work on our house. I never heard why the crew comes from Houston to us verse the drywall company getting someone more local, but they did. The texture is knock down and that part took two days, to spray with a large machine that holds A LOT of texture and the crew just points it at the wall and pulls the trigger, out comes the texture. He sprays a large area, then pause, and using a trawl to knock the top off the texture.... One idea we had was to have them texture a sheet of drywall outside, then cut it in to 2'x2' sections, this is then painted with samples of the color we are considering (good thing as some looked too blue for us).... Now, on to priming the drywall, and painting the ceiling.

Photos

Every time I see this, I am reminded how large of an area it is: about 30 feet long and 33 feet wide.
Got to love the view.
The door to the upper deck
Using the trawl to knock down the texture on the ceiling
The trailer for the knock down spray
Texture
Long way up there
The back stairs
Color samples, far right was too blue, center will be ceiling and dark accent wall, just need to find the correct light gray color.



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/9/2016

We have started the application of drywall mud (i.e. tape and float). And they are guessing three days to have it sanded and floated out for the texture guys to come in and spray the walls.

Photos

The lift for the upper part of the great room
Walking on stilts
Master bedroom
Spiral stairs
Lift for the ceiling, about 24 feet to the peak
Looking good
Towards the fireplace, window for upper bathroom
The loft
And reverse
I keep saying it: LOOK AT THAT VIEW!!!
Kitchen, looking through the master



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/8/2016

They are done attaching the drywall to the studs, now they are taping out the joints, estimate is to take about four days, then another three to texture the walls, then paint. As a side note, Rubbish Inc. dumpster and company had the best price I could find, next day delivery, and I called them on Saturday afternoon to swap and they were able to make it on Monday morning.

Photos

Man, it looks large in this picture.
Loft over bedrooms
So high...
The lift arrived on Monday.
Sneak peek (yep, start of the mud).
Dumpster is full.
Swap out with empty one
Almost forgot a shot of the ceiling beams in the kitchen.



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/4/2016

Third day. People on the job. The work is flying by and the stacks are being reduced FAST.

Photos

Media room
Kitchen ceiling
Master (as seen thru the closet wall
"Hidden" stairs
Main wall for family pictures in the dining room
Media room upstairs
Media room from the other side
Back upstairs bedroom joint bath with pocket doors
Master closet pocket door
Looking down at the drywall mud to be used
Upstairs dormer bench seat
Media room wall leading to back bedrooms
Great room
Another view of great room
Master bedroom



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/1/2016

It has been a busy weekend, most of the punch list was done, blocking, photos for record of wires and pipes, HVAC closets, deck was not finished but progress is being made.

Photos

Looking down on the living room
Media room staged
Bobber and I adding arches to the Kitchen
Bed two closet
Dining room ceiling
Up the fireplace putting wires thru the media closet wall
Media closet, will be tight
Lots and lots and LOTS of wires
Internet, phone, and TV distribution boxes
The back side
Audio and video wires
Window in bathroom, (Lorie in the tub)
Bedroom dormer



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 2/27/2016

It took two trips, there was three people. One dropped off the trailer and forklift, then after unloading the truck headed back for the second load. The other two loaded the house with stacks of drywall all over the place. Drywall to start this coming week Wednesday, March 2nd and take about four days to hang. Then another two weeks to tape/texture. Planning to be done about March 18th.

Photos

Load number one, first floor
Second load is for the second floor.
Drywall mud
That lift has some reach, from ground to 22 feet to the upper deck.
They brought it in the second floor door.
Look at that Tonka toy. So small!
Waiting on the lift to bring it up
Not quite so small from this angle
Small again from the top deck
Lifting verse carrying up the stairs
Look at that view...WOW
WOW is right, that thing is tall.



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 2/26/2016

Insulation is being installed by: bestinsulationaustin.com. Thanks to: Michael (sales rep) who came by to look over my house and determine any issues that needed to be resolved before the spray foam installers came out. Travis who kept in touch with me about the schedule and techs. Double kudos to Robert, and his crew of two. All three of them came to my house at 7:50 AM the 1st day and got started, we walked the house and discussed the problems that needed to be overcome: 24-foot ceiling,  tight quarters, etc. They ran around the house, sprayed low expansion foam around all windows and doors, then placed plastic over the windows and doors. While this was going on, their generator on their trailer was fired up, running multiple pumps heating the fluid in the drums. It took about an hour to heat the fluids and prep the house, Robert was very knowledgeable, with 9 years in the spray foam business, The other sprayer on the team had 5 years, and the third member was on cleanup and he was kept running all day. With the 2'x6' walls, we went against the advice and elected to have 5.5 inches sprayed. (recommendation was three as that provides 94% heat transfer blockage and the next inch only provides 2%.  Five adds another 1% and the .5 even less..., with 5.5 I can guess about 97%) ((https://www.finehomebuilding.com/assets/downloads/guide-to-spray-foam-insulation-kits.pdf)) With 5.5" I know I am getting above the minimum but the cost difference was less than $1K and I just did it. Michael said three days. However If the installers wanted to, they could have been done in one, but it would have been a VERY long day, as it was that stopped about 6:00 PM, and started the next day...They got there about 8:00 AM but have to get the spray to temp first. finished around 2:00 PM for the foaming. After foam came the sound abatement install with fiberglass batt insulation. Now on to drywall!!!

Photos

Inside the trailer
Covering windows
start foaming from upstairs to down
laying down on the job...lol
shavings cleanup
shaving with a LONG saw blade in a reciprocating saw
Above windows
And under the pony walls
https://www.finehomebuilding.com/assets/downloads/guide-to-spray-foam-insulation-kits.pdf
One thing about a barn style roof is the angles
Dormer with bench seat
Dormer finished
Look at the foam in the loft roof area
Looking up at the loft dormer
Top of the house not much crawl space
Working above the great room
Look closely, monkey man at work
Media wall, look close you will see the audio wires
Upstairs looking to the master retreat
Master retreat looking to the media room
Loft restroom and media closet behind it



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 2/23/2016

Just a few days since last post and a few items of note.

1) deck is moving along 
2) the site is level for the barn

Now, we just need to get the foundation work done for the barn. Tomatoes that were planted the day after Christmas are getting bigger.

Photos

Main deck, staging the lumber
Progress on the right side of the house deck, Seth is really booking on this side, about one day to get this done.
The corner is not at 45 degrees as the main deck is 12 feet and the side deck is 8 feet so it takes some careful cutting to match the boards.
Inside the Hide a Hose box and floor sweeps have been installed. Thanks to Patrick.
Tomatoes that were planted December 26th... Did not have another way to put a scale other than my hammer.
The left side of the house, lumber staged for Seth this weekend
Another view from the upper deck
Digging to locate a good location for the leach field of the septic
Back up to the top of the hill.... need to level out a location for the barn, as seen from the back house, upper window
Location for the barn, as seen from the upper deck
Looking level
Went down about four feet, then realized it would be the bottom of a pit... changed and went down about 20" and floated out to level.
The picture does not show it but almost level spot for the barn.



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 2/16/2016

as a side note, our Aquaponics tank is back up and we have started some items.


Back in December, before our house sold, we started some tomatoes, just to see how fast they grew from seeds...

ANSWER......

S   l   o   w


this is about 6 weeks in and about 4 -5 inches

We planted about 17 different types of tomatoes, standard reds, Early Girl, cherry, Beefsteak, and some blacks, yellows, whites, mostly all heirlooms.

Photos

Tomatoes about 6 weeks
Tomatoes about 6 weeks
Aquaponics tank, and two grow beds



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 2/16/2016

Well it has been a while, not a lot has happened, just some minor work.


We are moving fast now with the spray foam scheduled for the 22nd, and (I hope) drywall to begin by the 1st. 

Spray foam will be about two days, drywall about three weeks. 

Water/gas lines have been retested and are pressured with water 
Decks have been started, 
BORA-CARE sprayed to stop the termites
Blocking in the walls is almost done for the closets
Septic (paperwork) was started and will be done in March
24x40 building will be ordered this week
Sauna designed and will be ordered
Hide-A-Hose and vac pans installed

While the inside is being drywalled, the outside will be getting:
Deck finished
Porch ceiling installed
Porch railing
Paint the outside
Septic
Chicken coop built
Garden put in
Leveling ground on the high side of hill
Propane (April/May)
24x40 building (April)
Fence for dogs (April)

Photos

Deer, about 100 yards out, standing still, waiting on me to get the site picture JUST right, then BAM! Gone before I could get a better picture .with my good camera.
Our worker bees allows us to AG exempt the property.
Feeding them takes a little time and colored sugar water.
One idea for the fireplace
Strange table, but WAY too much $$$$$.
Two flooring colors, both are pebble stone, mixed with epoxy and trowed down, cost about $5K more than tile, not sure if this is in the budget at this time.
This is the person doing our septic, nice guy, and reasonable rates, it will be turnkey. I just fill out the forms, and he does the rest... NICE.
BORA-CARE, the directions say two ft. up the wall, I went over four ft. on most walls.... I can only get there when walls are open, and I would rather spend an extra $50 now than thousands later.
Clean out of the grass under the decks
Big hunks of concrete dug out from under the deck
More hunks of concrete.... wish I had gotten them out BEFORE the deck was framed.
Clean and level for the weed barrier and the glass mulch
Another shot of the before
And after weed barrier was laid
Deck boards, with the tools to clean out under the deck
Upper deck almost done
Cannot wait till I can sit out here and enjoy a beverage and RELAX.
Looking down, about 12 feet to the lower deck, then another 8 to the ground
Look at that view!
I built a area 12x16 for the delivery, and here is what I will be putting UNDER the deck. Delivered by Texas Disposal System, from Garden-Ville, GLASS MULCH
Unload and they delivered 14 yards of glass mulch on a 40-yard dumpster
With this shot, looks almost empty, the 2x6 is for the Kubota bucket to ride on and (I hope) not tear up the tarp.
Unload, and SHAKE
(He almost got stuck...this was his front tires)
I paid for this????
Oh, once cleaned it is... interesting. several advantages of glass mulch: due to the refractory of the glass: Weeds do not like it Ants do not grow a bed under it Critters and snakes HATE IT It is long lasting, takes over 1,000 years to decompose! Permanent landscaping mulch that never fades or needs replacing Glass mulches are a unique alternative to traditional bark or gravel mulches.



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 9/4/2015

Well it has been a while and a very busy summer with my company, so the house has been put on the back burner while the summer ran its course.

Over the last several months we have been running all the low voltage wires, placing blocking in the walls,  building ceilings in closets and doing all the little punch list items on the house that were needed to get ready for spray foam.

We have also been working on the "guest house" that we will be staying in for the next few months as we head down the last stretch to finishing the home.

Keep an eye here in about a month for update on spray foam, drywall, and finish out of the inside and outside.


Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 2/3/2015 9:36:46 PM

Roof is on...

Photos

From the lower roof, 180 bundles plus starters
the easy way to put the shingles on the roof
80 bundles on the top back and forth walking the ridge.....NOT ME
almost done with the top load
on to the lower sides loading the shingles
South side, rain and the roofers were up there
north side of house, as seen from the garden
the roofers were fearless and they hussled
standing on the slope using foam pad to keep from slipping
they even painted the stacks and all metal trim to make them less visible
Roof done, as seen from the red barn



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 1/21/2015 10:54:11 PM

Plumbing is now done for the top out, all pipes ran, and verified, gas line is in place

 electric is in progress, done upstairs
HVAC duct is in place
Panasonic ERV is scheduled to go in  on Thursday
Roof should be on next week...MAN that was stretched out, glad we used Avantec 1 1/8th" decking for the 2nd floor

NOW, on to low voltage...

Media closet will be located upstairs in a small area that is all but useless, BUT will allow a much cleaner look as all TV's will be mounted on the wall and no boxes or other items will distract from the clean TV mounted look.

Each wall mounted TV location will get:
1)electric outlet behind where the TV will be
2) HDMI  over Ethernet (cat 6) back to the media closet(green wire)
3) antenna connection back to the structured wiring closet and then connected to amp and up to antenna  in the "attic"(white coax)
4) coax back to the structured panel, this is redundant in case needed or for viewing cameras on tv(black solid core coax)
5) Ethernet for internet ready TV's(cat 5e purple)

then each bedroom will also have 2 locations with phone(red cat 5e) and Ethernet(purple) and perhaps another coax location, 2 speaker lines and a whole house control panel with intercom(Yellow cat 5e)

media room will have location for projector wired up as well as a location high on the wall in case we decide to put a TV instead of a projector, 7.2 surround sound pre-wired, for in wall use as well as whole house audio. and 2 loops from the back to the projector and TV location for  "what ever" we want, and a couple of  Ethernet/phone outlets

Washer Dryer locations(all 3) and the 2 HVAC locations (as well as stove and fridge) will be wired for Ethernet...heck 10 years ago we were lucky to have 1 PC, never know what the future will bring and wire is cheep.

Wiring 2 locations for wireless routers in the crawl space laughing called an attic

Loft will have an HDMI/COAX/Ethernet?antinna location for a projector across the main downstairs to about 120" screen, as well as whole house audio/intercom

The pictures are just wires (and not all) from the upstairs, little blurry as the battery was low and did not let me use a flash.

Plumbers were also onsite today to attach the house to the 2" line going across the garden. Digging under the deck(ok thru) joists






Photos

Structured wiring panels
inside the panels black is coax white coax antenna red phone purple Ethernet
yellow whole home audio white zig zag is speaker wire for later install of speaker
TV location, blue is power, coax, antenna, and Ethernet.
wire, wire, and more WIRE....ARRRR
The fog this morning
plumbing joined to the house
and the trench



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 12/27/2014 5:07:07 PM

At this point we have:
HVAC done
plumbing top out, need to set the tubs and  shower fixtures
Electric is to start on Monday

Roof.....well.....that is a issue.

I am scared of heights and just found out that the framer placed the fascia boards incorrectly and that the roof deck was cut almost 2 inches inside the fascia. on both ends of the building and some of the dormers.

I talked to the framer and he is to have someone come out and resolve the issue on Monday, then we can get on to placing a roof


Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 12/13/2014

Into December, and it is a painful month...

If you are in the Austin Area and want to buy a GREAT chandelier CHEAP, let me know.

Photos

Chandelier that my wife found at a auction, Just over $500 and we now have 10 chandeliers in storage, as of 12/26, need NONE
Seth climbing above the windows to get that sticker that the window manufactures left on them
Trees of silver as the HVAC people putting up
More HVAC
Still more HVAC Stuff
My arm. the sweatshirt I was wearing got caught in the saw and dragged my arm in to the blade...Trip to the ER and lots of stitches later, I might live.
Caulking the outside for paint



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 12/1/2014

November has come and gone.

I have been too busy on other projects to work on my house but that is going to change.

December has the plumber, HVAC, and electric scheduled...hope to put a roof on too.

So lets see how it goes.

On another note, Lorie found a 48" stove that she just HAD to have....LOL, with her cooking and canning I did not object...lol.


Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 9/10/2014

Siding done

Frame done
Windows in
Felt on roof

Issues found, and how to avoid

The pipe for the upstairs bath was in the slab in the wrong place; they used that wall as a base and all other walls were in the wrong location. Had they moved that wall and corrected on the other side of the kitchen it would have been an easy fix, however the 7" was lost in the entrance on the side of the house.

The sliding doors, and the windows above, were not the correct size openings.

This is due to my being gone on the day of framing and not double checking the openings... This cost a lot of material to rebuild that wall. and replace the headers with longer ones.

Photos

In great room looking to kitchen
"Hidden" stairs in bath
Looking up main stairs in great room
The view
Siding going up
Great room windows and the arches
Finished wall
Man, look at that glass!



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 9/4/2014

Almost done with the frame out, the Hardie was almost done, just 1 dormer and upper 1/2 the "view" wall left. they should be done today or Friday.


I included pictures of the inside as they have cleaned up the ground floor taking out the scaffolding that they built.

Photos

Hardie on the dormers, north side
Starting the tar paper, that person walking the ridge
North side papered
DONE!!! With the papering of the roof... now on to the last dormer
Living room
Living room other view
Kitchen look at the cedar beams
Kitchen other view looking to the master
The pantry off the kitchen
LR fireplace
24 ft. inside to the highest point
Loft
Loft looking out
The best price I found for Dry in and shingling; tell him the BIG BARN sent you.



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 9/2/2014

Working on the Hardie siding, the dormers, and the fur downs in the house.

The frame out is almost done and WAY over budget on the material... The roof took a lot of wood to build and they are not done with the fur downs and blocking yet...

Photos

Working on the south side of the house, siding almost done
Door frames in place
Look at that siding!
Cedar beams in the kitchen
Dormer water over proofing
Side slider looking to kitchen with the arches
Main view wall getting siding
Fur down in the back bedroom
South side siding done, middle dormer water proofing installed
East "view wall"
North side of house



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 8/28/2014

Putting on the siding and roof, lots of pictures

It rained and the fellas were out till it started to come down in buckets.

Photos

Install on doors
And windows
This is the bathroom window.
Install overhang
Raining and still out there
Second bedroom
Taking out the fireplace
And it is down
Putting up house wrap
Roof sheeting going on
Roof going on
Dropping the roof sheeting
Steeper than it looks
Told ya
Taking shape
"Hidden" passage upstairs
Inside
Scaffolding to up the peek, working on the Hardie



Comments (1)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 8/23/2014

Still on the trusses... As you can see there is a LOT of work that went into the trusses, but they are almost done as of 8-23-14.

Photos

Working on the trusses
Nailing the web trusses together
Dormers all will be flat on the inside
Look at that view, and he is WAY up there, about 18 ft to the bottom of his feet.
Climbing in the truss
Look at all that lumber making the scaffolding.
Upstairs
View of the trusses and the gussets, they were both glued and nailed
Upstairs loft, still some bracing for the scaffolding
Working on the second floor porch... It will be about 20 feet up.
About 16" on center
Looking good
WOW, looks WAY up there
6x6 posts for the deck and roof
6x6 posts for the deck and roof, other side



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 8/18/2014

Roof framing is SLOW, lots of time building the trusses, putting on the 6x6 porch posts, and then there is the TRUSSES... ARRRR

Photos

6x6 cedar posts, we used a spar urethane to treat the posts so they will keep their color longer
The south side of the house facing east
Again south side... Look at them posts... Hehe
East side of the house
West and north side
Pressure treated ply on the dormers
West and south sides, as seen from our "little red barn"
Sconce that Lorie likes about three feet tall



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 8/13/2014

sheath·ing (shng)
n.
1. A layer of boards or of other wood or fiber materials applied to the outer studs, joists, and rafters of a building to strengthen the structure and serve as a base for an exterior weatherproof cladding.
2. Nautical An exterior covering on the underwater part of a ship's hull that protects it against marine growths.
3. The act of providing sheathing.

This is the part that starts making the structure look like a house versus a vertical bunch of toothpicks stuck into pieces of foam... Hehe.

The most vulnerable part of the home is the bottom 2-3 feet of the walls as this is the part that gets water splashed on it with rain. The Hardie siding does protect this area but if you were to talk to people that repair homes they will say this is the area that gets damaged the most due to water.

Due to the above we elected to use pressure treated plywood on the bottom four feet where it will be exposed to potential weather/water, both ends and the corners, dormers... Due to the overhangs we used OSB on the long sides.

The cost difference was $26 vs. $8 per sheet and we used 35 sheets so total of about $600 this might be money wasted. However, if it stops a $2,000-$5,000 repair in 10 years... GREAT!

Photos

Two dormers on the rafters, they had the third and chimney built but I did not get a picture yet
Here is the pressure treated ply on the bottom four feet
And around the corners for about 4-8 foot under the deck
OSB under the porch roof
SHEATHING DONE on this end... Look at the scaffolding they use, 24' tall posts, and the top held by a 1/2" OSB at the top.
The end wall before the sheathing, lower right side is our bedroom
View wall from the loft
Inside view of our bedroom wall, you can see the pressure treated plywood on the corner
Long view of the house, as seen from the far hill top about 3/4 mile away
OSB on the side with one lonely post installed



Comments (1)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 8/13/2014

Roof is started, lots of work when the framers show up... They were finishing up other projects and were only working on mine for three days a week... With a total of about eight full days on the job they have been rocking when there, frustrating when not as nothing gets done.

Photos

First rafter has been put up
Goes quickly after the first
Looking up from below
Hope you are not scared of heights
Scaffolding to get to build the rafters
Yep a pair of boots above that cowboy hat, this guy is NOT afraid of heights
From the dormer looking over the trusses
The first part of the custom built trusses
Now putting up the top part of the trusses
Look at the cut in the lower boards; this is to keep the upper part of the roof from pushing out.
Putting the rafters to the ridge
Joining to the ridge
See the bird mouth cut, it is better than an angle cut as it keeps the board from just slipping out.
once the first was done the rest were easy, they cut all the boards one day and built this the next.
Look at the windows... and the view... too bad all openings were put at 24" as the plans called for 30... OOPS
SPOILER ALERT... here is the windows with the corrected sizes and sheathing installed LOOK AT THAT VIEW... WOW can not wait for the deck to be built and enjoy a drink with this view in the evening... this is facing east so will be shaded by the house



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 7/28/2014

Second floor is almost done and they have been figuring the truss layout for the roof, and MAN, this is looking bigger that I expected.

Photos

Second floor walls
Look at the upper truss, just started but it shows the soon to be roof line.
Eight-foot wide deck on the two long sides will be covered
Wrap around deck



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 7/26/2014

Man, let's count the days:

Wednesday all the lower walls up
Saturday trusses on, bracing
Thursday decking, start of second floor
Friday second floor and frame porch

That is it to this point, and the pictures are noon on Friday.

The contractor is saying he will be sheathing the house on Tuesday, and we have windows scheduled for delivery Wednesday, he thinks it will go fast at that point...?????? And this is slow????... LOL

Photos

Second floor deck over the kitchen
We have stairs.
Looking down over the master at the porch going it
Porch on Master side
Framers working FAST
Looking down from loft
This shows the second floor but not the trusses; once they put the trusses up they will cut down where needed.



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 7/24/2014

The day started with rain, but cleared up and we were able to put in the strong backs (2x6 for stiffening the joists), and put up the second floor deck.

Photos

Long view of trusses up
This is the glulam beam that goes above the stairs.
Weight, just about A LOT
Had to NUDGE it over
Fearless
Fearless walking on the joists
1st Advantec deck... YAY
Coming along



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 7/23/2014

Third delivery of lumber, total wood cost is $22K.

Weight of deliveries (I think it is interesting) was:

First: 16,446 lbs.

Second: 25,548 lbs.

Third: 39,944 lbs. max for the truck was reported as 42,000 lbs. material and 6,000 lbs. for the lift on the back.

Total so far is 81,939 lbs. of wood.

This does not take in to account the OSB for the roof or the siding nor the Hardie exterior, just the wood for the frame and decks skeleton...

Photos

Full truck
1/2 full... LOL
Interesting how they load this on the back for transport
First truck to get stuck... 14+ concrete trucks, and the third delivery by Pro Build and he was the first to get stuck.
Tried to pull out but no-go, had to call the "boss" but I had to leave before he could be rescued.
Deer was less than 100 feet from the construction site on a day off by the crew.



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 7/22/2014

Trusses are up!

By end of day two they had the wind bracing up and had finished putting up all the trusses for the first floor.

Still needed to put up the the big glulam and add the bracing for the trusses but we are almost ready for the 1 1/8" flooring.

Photos

Delivery. They use a roll-off truck for delivery.
Start of hauling the trusses around the house. See all the cross bracing in the house?
This was a long one for over the kitchen/dining room.
GLULAM... This thing is two feet tall and ten feet long, about 400 lbs and took six men to raise it up to the level of the slab.
Start of putting up the trusses


Files




Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 7/17/2014

One day and the framers had the walls up and ready for the trusses...




Tonight however... rain.

Photos

Long view, almost all walls in place
Living room: you can now see the view out the three 8-feet-tall by 9-feet-long glass walls.
And another 8' tall, 9' long view going in the master bedroom... Imagine waking up to this every morning.
Picture window from the bath
In the living room, looking to the kitchen, we still need a wall between to be built.
This will be the pantry (hidden) for the kitchen; there will be lots of storage space.
Bedroom number two: still has nice view out the back of the house
Rain tonight... Have about a half-bundle of 2x lumber and 6 sheets of OSB on the ground... Oops, I knew I should have used that tarp... :-(



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 7/16/2014

Well it is time to start framing today and yesterday they delivered the first $5K of material.

Did not look like much to me.

The framers arrived today to start framing and I arrived about two hours later to see that they had the walls drawn out and were putting in windows and door opening on the foundation.

Friday: trusses and second-floor material to arrive, but interested in seeing what they have done on Thursday...

Photos

$5K of lumber
About to start raising walls
#1 wall
Had to leave about noon and this is what they had done.



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 7/10/2014

Well, I was going to start framing in April, however the truss people messed up my schedule by changing the roof truss placing a beam down the center of the ceiling and a post in the middle of the stairs...

Four-ft. wide stairs and a post in the middle...

Yeah, right.

Then the next set of drawings cut the ceiling down two-ft. right in the middle of the upper windows at that end.

NOPE

Finally we decided to just site-build the trusses, but the delay caused another issue with the framer... He was too busy for me... Back to looking for someone else.

SO, windows have been delivered and are sitting in Austin warehouse.

Second floor trusses to be delivered next Friday.

Wood package out for final price.

OOPS, need to order tubs and three 8' exterior doors.

Type at you next week when the framers have started.


Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/15/2014

3/14/14

Foundation is released from its frame and looks BIG...

There was a location that pushed out about four inches and bowed the wood but it is going to be under the porch so not a huge deal.

Photos




Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/15/2014

Due to vacation on the first of April (no joke), we will be putting the project on hold 'til April 8th.


We will be ordering windows, doors, tubs, trusses and lumber to be delivered on or after April 7th for the framers to start building the house.

We are  not going away, just will be taking a break till after vacation.


See you in April

Photos




Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/12/2014 7:23:45 AM

WE HAVE SLAB!!!!!!!!!!!!

On March 11, 2014 American Concrete and Construction  scheduled a pumper truck and 12 trucks(120 yards) of concrete to be delivered...After talking to Marcus I decided to raise the foundation to 4000 PSI mix. (verse 3000 PSI called for in the plans) for a stronger foundation for a cost increase of about  $1,000) 

The pumper arrived about 1030 AM and the fleet of Lauren trucks arrived about 1045 and continued till 330 PM with the last 7 yards delivered(only needed 6 but better to have little extra)








Photos

interesting view of the rebar on the side wall
pumper truck getting ready. look at that bracing
and it starts on the tall walls, build up a few feet then move on, come back later for another few feet...repeat as needed till full
18" side walls on the house(most foundation walls are 12"
12" end wall about 8 foot tall
2 of the 13 trucks that brought the concrete
look at that rebar and beams....this slab is 6" thick on the far side and 4" on this end
ok, that is my finger in the way...lol
optical illusion shows a ramp being built but it is level
looking across the disked up garden



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/12/2014 7:11:56 AM

we have slab part 2

Photos

visiting wildlife checking out the activity
step down for the shower...OOPS....my goof in verification before the big day
I found a shady spot. (Should have stayed there, I got a sun burn...OUCH)
looking up hill at the foundation
This is the view guests will have after parking there car. Getting close to being finished
12 full trucks, just needed 6 more yards
THAT'S IT.....
now to level off the last area
I took a little of the left over for the gully....
but Thanks to Gail I used it for the final step off the porch.... (the truck was washing out and had added a lot of water to the mix before I got to it)
View of the drive and slab
Looking good guys



Comments (0)
Private Message

Posted to 697-Marlin by TC in Austin/McDade, TX on 3/9/2014 10:05:47 AM

steel work progressing

Photos

kitchen plumbing
steel for beams
tall wall
8 foot down
grid work
column to 3x3 footer about 6 foot down
stair plumbing
unused steal
master bath plumbing



Comments (0)