From $9.95



Syndication






Statistics

Users
Total: 26,789
Visited Last 30 days: 94
Forum Messages
Total: 20,466
Last 30 days: 1
Forum Evaluations
Total: 24,012
Last 30 days: 0
Journal Entries
Total: 4,704
Last 30 days: 13
Connections
Total: 14,872
Last 30 days: 3
Downloads
Total: 72,263

Journals

Name
Mutton-Busting Nashville, TN
1,851 Visits | 56 Posts | 94 Pix | 0 Videos
Tanglewood Colorado Springs, CO
96,327 Visits | 819 Posts | 2,272 Pix | 42 Videos
insulation4us Wilmington, DE
55 Visits | 1 Posts | 4 Pix | 2 Videos
insulation4less Folkestone, AL
79 Visits | 1 Posts | 3 Pix | 0 Videos
697-Marlin-Near-Aust... Austin/McDade, TX
2,546 Visits | 39 Posts | 262 Pix | 0 Videos
eModernDecor South El Monte, CA
114 Visits | 1 Posts | 5 Pix | 4 Videos
Insulationstop Latham, NY
98 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
309 Visits | 2 Posts | 0 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
61,166 Visits | 159 Posts | 472 Pix | 3 Videos
NorthPoleHome North Pole, AK
33,363 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
274 Visits | 1 Posts | 0 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
11,646 Visits | 29 Posts | 10 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
2,160 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
8,407 Visits | 4 Posts | 0 Pix | 0 Videos
Seven-Peaks-Faswall-... Graeagle, CA
37,843 Visits | 50 Posts | 320 Pix | 1 Videos
Barrel-Race Houston, TX
9,090 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
1,526 Visits | 1 Posts | 0 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
23,056 Visits | 39 Posts | 118 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
45,509 Visits | 44 Posts | 191 Pix | 0 Videos
Bladenkirk White Oak, NC
1,745 Visits | 6 Posts | 4 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

I'm having fun building so far!!! Thanks for having the website and the book. You got me started.
AG in Colorado Springs


Stan's Forum Posts: 3
Journal Entries: 11
Interview Answers: 65

Private Message


Image from Stan's blog

Subscribe to this journal...


This journal has been viewed 15750 times.



Newest << >> Oldest


Posted to WindyJ by Stan in Knoxville, TN on 7/2/2007

Yes finally we are finished. Been so busy trying to finish I haven't had time to made any post. We came in a little over budget, but who doesn't. The concrete killed us, Between the shop, foundation, garage, porches, and driveway we had 293 yards. Subs were great, very few problems, but I'm glad it's over. I think we saved about $45000 - $50000 by doing it ourselves. Hope you'll goes as well.    Stan in Knoxville


Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 7/2/2007

Yes, finally we are finished. Been so busy trying to finish I haven't had time to make any journal entries. We came in a little over budget, but who doesn't? The concrete killed us. Between the shop, foundation, garage, porches, and driveway we had 293 yards. Subs were great, very few problems, but I'm glad it's over. I think we saved about $45,000 - $50,000 by owner-building. Hope you'll do as well.
Stan in Knoxville

Photos




Comments (4)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 4/10/2007

All has gone very well to this point, but things are slowing. Electrician is two weeks out, granite tops four weeks, no plumber till countertops are in. We're hoping to be finished in 6 weeks.

Photos




Comments (2)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 3/21/2007

Well, it's probably obvious we've been busy. We're finishing the inside and the exterior steps and porches. Cabinets are next, then final painting, plumbing and electric. Subs have been great, no problems (none). We have gone over budget in some places, some due to us, some out of our control. I'll post inside photos after cabinets are in.   Stan

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 1/3/2007

All rough-ins are finished, electric, plumbing, vac., A/V, and security. Drain field is finish and insulation is next.

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 12/25/2006

We have been waiting for the electric rough-in for two weeks. Plumbing, HVAC, fireplace and roof are finished. All inspections should be done next week ready for insulation. All is going well. We drove 8 hrs last weekend to the Kraftmaid warehouse, got about half of what we need. One more trip and we will buy the rest from the local store.

Photos




Comments (7)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 11/26/2006

7 1/2 days to this point. These guys are unbelievable. Ran out of lumber on day 7. They have about 1/2 day to finish when lumber arrives. HVAC, plumber, doors and windows by another sub this week.

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 11/18/2006

This photo is after only four days of framing, one of which was raining off and on. They were so fast the lumberyard had a hard time keeping up. The entire house package was on site by the fourth day. They tell me three-four more days it will be completely under roof, all stick built.

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 11/10/2006

Ready to frame.

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 11/4/2006

Oct. 12, 2006 - Broke ground today, cut driveway and started pad.

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 8/6/2006

We have our dream-house land, finally, 9 ac., flat, half open, half wooded. In Tennessee, flat is rare. We just finished our barn/garage last month. Morton Building 42' x 105' with a 12' shed roof on one side. Neighbors loved it. We are starting the process of taking sub bids on all trades. Hope to break ground by end of Sept.


Comments (2)
Private Message


Newest << >> Oldest


Copyright 1997-2015 Consensus Group Inc.