From $9.95



Syndication

Statistics

Users
Total: 29,619
Visited Last 30 days: 132
Forum Messages
Total: 20,645
Last 30 days: 8
Forum Evaluations
Total: 24,144
Last 30 days: 2
Journal Entries
Total: 5,084
Last 30 days: 12
Connections
Total: 15,110
Last 30 days: 6
Downloads
Total: 78,708

Journals

Name
TheHoskensProject Dome-ville, FL
65,162 Visits | 175 Posts | 520 Pix | 4 Videos
MesaBarnHouse Mesa, AZ
167 Visits | 11 Posts | 6 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
20,056 Visits | 187 Posts | 282 Pix | 3 Videos
My1stOB Melbourne, FL
36 Visits | 1 Posts | 0 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
423 Visits | 3 Posts | 1 Pix | 0 Videos
Our-log-home Thomaston, GA
353 Visits | 2 Posts | 4 Pix | 0 Videos
697-Marlin Austin/McDade, TX
5,500 Visits | 63 Posts | 508 Pix | 0 Videos
skiddinginbroadside Livermore, AL
337 Visits | 1 Posts | 0 Pix | 0 Videos
thedaniels Graham, WA
430 Visits | 5 Posts | 5 Pix | 0 Videos
Cabin-Addition--Spra... Austin, TX
396 Visits | 1 Posts | 5 Pix | 0 Videos
Tanglewood Colorado Springs, CO
108,975 Visits | 895 Posts | 2,362 Pix | 42 Videos
7th-and-last-Home-bu... Saratoga Springs, UT
778 Visits | 3 Posts | 10 Pix | 0 Videos
My-first-home
690 Visits | 1 Posts | 1 Pix | 0 Videos
Bruce Fowlerville, MI
643 Visits | 1 Posts | 0 Pix | 0 Videos
Sparky New Harmony, UT
655 Visits | 1 Posts | 1 Pix | 0 Videos
Mutton-Busting Nashville, TN
6,694 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
41,623 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
1,553 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
1,363 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
26,109 Visits | 41 Posts | 119 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

I wish I had time to read every post that was ever made on this site. Lots of stuff to dig up.
Grant in Jacksonville, AL

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.


Stan's Forum Posts: 3
Journal Entries: 11
Interview Answers: 65

Private Message


Image from Stan's blog

Subscribe to this journal...



This journal has been viewed 16530 times.



Newest << >> Oldest


Posted to WindyJ by Stan in Knoxville, TN on 7/2/2007

Yes finally we are finished. Been so busy trying to finish I haven't had time to made any post. We came in a little over budget, but who doesn't. The concrete killed us, Between the shop, foundation, garage, porches, and driveway we had 293 yards. Subs were great, very few problems, but I'm glad it's over. I think we saved about $45000 - $50000 by doing it ourselves. Hope you'll goes as well.    Stan in Knoxville


Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 7/2/2007

Yes, finally we are finished. Been so busy trying to finish I haven't had time to make any journal entries. We came in a little over budget, but who doesn't? The concrete killed us. Between the shop, foundation, garage, porches, and driveway we had 293 yards. Subs were great, very few problems, but I'm glad it's over. I think we saved about $45,000 - $50,000 by owner-building. Hope you'll do as well.
Stan in Knoxville

Photos




Comments (4)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 4/10/2007

All has gone very well to this point, but things are slowing. Electrician is two weeks out, granite tops four weeks, no plumber till countertops are in. We're hoping to be finished in 6 weeks.

Photos




Comments (2)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 3/21/2007

Well, it's probably obvious we've been busy. We're finishing the inside and the exterior steps and porches. Cabinets are next, then final painting, plumbing and electric. Subs have been great, no problems (none). We have gone over budget in some places, some due to us, some out of our control. I'll post inside photos after cabinets are in.   Stan

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 1/3/2007

All rough-ins are finished, electric, plumbing, vac., A/V, and security. Drain field is finish and insulation is next.

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 12/25/2006

We have been waiting for the electric rough-in for two weeks. Plumbing, HVAC, fireplace and roof are finished. All inspections should be done next week ready for insulation. All is going well. We drove 8 hrs last weekend to the Kraftmaid warehouse, got about half of what we need. One more trip and we will buy the rest from the local store.

Photos




Comments (7)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 11/26/2006

7 1/2 days to this point. These guys are unbelievable. Ran out of lumber on day 7. They have about 1/2 day to finish when lumber arrives. HVAC, plumber, doors and windows by another sub this week.

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 11/18/2006

This photo is after only four days of framing, one of which was raining off and on. They were so fast the lumberyard had a hard time keeping up. The entire house package was on site by the fourth day. They tell me three-four more days it will be completely under roof, all stick built.

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 11/10/2006

Ready to frame.

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 11/4/2006

Oct. 12, 2006 - Broke ground today, cut driveway and started pad.

Photos




Comments (0)
Private Message

Posted to WindyJ by Stan in Knoxville, TN on 8/6/2006

We have our dream-house land, finally, 9 ac., flat, half open, half wooded. In Tennessee, flat is rare. We just finished our barn/garage last month. Morton Building 42' x 105' with a 12' shed roof on one side. Neighbors loved it. We are starting the process of taking sub bids on all trades. Hope to break ground by end of Sept.


Comments (2)
Private Message


Newest << >> Oldest


Copyright 1997-2017 Consensus Group Inc.