Posted to sherman by Rob in Downers Grove, IL
on 11/27/2009
Looking back at my last journal entry about two weeks ago, I can see that many things have happened.
The forms came off, then came the waterproofing, then the insulation board. I burned a couple of days after the forms came off because I failed to realize that it takes a few days for the surveyor to produce a top-of-foundation survey. This survey is required by the village before they will schedule the foundation inspection and it takes a couple of days to process. The foundation inspection has to happen before the backfill so I had to push out the backfill. Luckily, I had some play in the schedule so it was not much of an issue. The backfill happened right before we stated to get more rain. The the rain pushed the underground contractor two days and then he pushed me one because he has to fix a water main break. It was not until this past Monday that my sewer, water, gas and electric service were installed.
I am not complaining because the sewer contractor did a fantastic job. Originally I was going to have him just do sewer and water. Then my electrician told me that he could place the buried triplex cable for the electrical service if the underground contractor would dig the trench. This was a great idea because it could possibly now take less time to make the final connection to the power grid having provided my own service drop to ComEd. ComEd is super slow when they do anything. The best part is that I am going to save some money in the process. I wondered about the gas service and if that was something that I could do myself. Turns out if you install your own conduit to the parkway, Nicor charges about half as much to make the final connection. So the sewer contractor created a trench for this too for a small fee. I lucked out on the sewer connection too. There is a piece of ductile iron pipe that runs into the parkway off the sewer main. I was able to reuse this pipe for my new sewer service. Had I not been able to do this, I would have had to open and then patch the street. This probably would have cost around $1,000 to repair.
The plumber was in there at the beginning of this week to do the underground plumbing. He installed the rough-in for a future basement bathroom along with the ejector pit. I found my plumber when he was working on a new construction job around the corner from my old house. It was close to being a cold call. I had been kinda concerned about hiring him because I did not find him via word of mouth like I had for the other subs. It is funny, because everyone I know hates their plumber. I can do plumbing, but I don't have the time. So I figured I would try to find a plumber that was affordable and supplement whatever was not included with my own work. So far, things are working out nicely and I haven't had to do anything. His office is very responsive, his work is good, and he has done what he said he was going to do. He is always available on the phone to answer questions, calls you back, etc. When I was out there the other day, he had a question about what was going to be allowed by the village. He called the inspector directly to clarify and when it came time to inspect, we had no issues. I like it when there are no surprises.
The day before Thanksgiving the carpenter set the structural steel and started the first floor deck. I did not setup an account with the steel company so they required payment on delivery. I was not there when the steel was delivered. Woops! Luckily my wife was available to run a check out to the job site.
Today the carpenter was back our there (Black Friday) to complete the first floor deck. He has been great, sharp guy with lots of experience. Competition for carpentry has to be tough right now, there are many good people out there. When I sent out bids, I had several great names for carpentry. All of them had great references. One guy was a friend of the family, he had built additions for both my uncle and my dad. Another guy built my wife's friend's house (they were owner-builders too), two other guys came strongly recommended by my architect and by my buddy at the lumberyard. I went with my neighbor who came highly recommended by everyone in the neighborhood. I figured that if he could work on all these peoples' houses and still manage to remain friends with them, he must be doing something right. So far things seem to be working out nicely. Next week they will be starting on the first floor walls.
It is nice to start to see things come together. Tomorrow my wife and I are going to walk the first floor deck to get a feel for the kitchen layout. I am always second guessing the design of the house. I should have done this, could have done that. I hope I don't feel this way when the house is done. I like to tell people that the next house I build after this one is going to be really great! My wife then says that her next husband after this one is going to be even better.
Photos
|
First-floor deck. |
|
|
Almost completed first-floor deck. |
|
|
Side of the house, basement windows and fireplace. |
|
|
Back of the house after backfill. |
|
|
Mud pit that was created when we installed the new sewer and water service. |
|
|
Beginning of the first-floor deck. |
|
|
|
Foundation just prior to backfill, walls braced. |
|
|
Before... Front of the house with the forms on. |
|
|
After... Front of the house with the forms off and the insulation board. |
|