From $9.95



Syndication

Statistics

Users
Total: 32,932
Visited Last 30 days: 191
Forum Messages
Total: 20,967
Last 30 days: 6
Forum Evaluations
Total: 24,160
Last 30 days: 0
Journal Entries
Total: 5,401
Last 30 days: 8
Connections
Total: 15,247
Last 30 days: 4
Downloads
Total: 87,234

Journals

Name
getpestcontrol Delhi, AL
44 Visits | 2 Posts | 1 Pix | 0 Videos
NorthShoreBathrooms
19 Visits | 1 Posts | 2 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
618 Visits | 5 Posts | 4 Pix | 0 Videos
furnacerepairon St Catharines, AL
42 Visits | 1 Posts | 9 Pix | 0 Videos
furnacemkm Markham, AL
41 Visits | 1 Posts | 7 Pix | 0 Videos
vallejocleaningservi... Vallejo , CA
40 Visits | 1 Posts | 1 Pix | 0 Videos
noithattrieugia tphcm, AL
61 Visits | 1 Posts | 0 Pix | 0 Videos
httpownerbuilderbook...
125 Visits | 1 Posts | 0 Pix | 0 Videos
Packers-and-Movers Delhi, AL
397 Visits | 2 Posts | 1 Pix | 0 Videos
Best-Access-Doors Jackson, AL
176 Visits | 1 Posts | 0 Pix | 0 Videos
Concrete-Contractors...
239 Visits | 2 Posts | 0 Pix | 0 Videos
bird Springfield, MO
172 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
120,481 Visits | 1,004 Posts | 2,581 Pix | 47 Videos
Drywall-Repair-Lehi
250 Visits | 1 Posts | 0 Pix | 0 Videos
ianpundt
292 Visits | 1 Posts | 0 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
627 Visits | 2 Posts | 2 Pix | 0 Videos
httpswwwfaxitfastcom... salt lake city, AL
256 Visits | 1 Posts | 0 Pix | 0 Videos
Owning-My-First-Prop... Grand Rapids, MI
378 Visits | 1 Posts | 0 Pix | 0 Videos
movers-and-packers Hyderabad, AL
372 Visits | 1 Posts | 1 Pix | 0 Videos
Investment-Propertie... Rochester, MN
422 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

I'm having the time of my life building our house the way that WE want it. So far, everything has been wonderful, probably due to the fact that I spent the last two years planning for this build.
Sara in Bellingham, WA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Jo-Lynn in Issaquah, WA's Journal Entries


Click here to create your own construction journal.

Posted by Jo-Lynn in Issaquah, WA on 5/21/2011

We're finally dried in! Of course, the rain stopped four days ago... go figure! After much research, we decided to go with a 30-year, high definition Owens Corning (Oakridge) shingle in Driftwood color. I like the variation and the visual texture (hard to see in the pictures) -- I've already settled on a mossy green for the body of the house, so I think it will coordinate nicely!

We're on to plumbing now -- it's actually been going on in fits and spurts over the past couple of days. Some framing changes need to be done so that it finishes smoothly, but that shouldn't be a big deal. In the daylight basement bathroom, in order to accommodate the drains and venting, we're going to have to drop the ceiling along the tub/toilet closet wall approximately 6", but since we're starting with 9' ceilings, that shouldn't be a big deal.

I did decide to reconfigure the bathroom on the fly last week; details are on my construction blog. It saved having to remove some existing framing and actually gives me more room for the dual sinks and the base cabinet between them. So what if the door now opens into the main room rather than the hallway?! It makes it easier access for hubby's wheelchair, too, so I'm thinking win-win!

Moving on to mechanical, siding and electric proposal selection in the next week. Final framing (tub deck, fireplace box, window relocation) and deck structure will be done in the next few days. The final four windows will be installed by the framers before they leave. Since the exterior doors have now arrived, they'll also be installed by the framers too.

Updated my cabinet order to account for a larger cooktop/cabinet and some additional molding. Will be pulling the trigger shortly with a delivery date of July 15. Can't wait!

Also ordering the elevator next week -- 8-12 weeks for delivery is standard. They're giving me an upgrade to smoked acrylic gates on either end of the cab at no charge -- saves me about $600, so YAY!  

Speaking of saving money, by using the subcontractors we got referrals on from the other builder in our little pod, we saved over $3K on our roofing and are set to save approximately $2K on our siding labor. I can hardly wait to see what their mechanical and electrical guys can come up with! It's amazing how people who are well-employed by another builder in the area can cut costs when they want to stay that way! Also, since they know we were referred by the builder they're already working with, they're not likely to do us wrong because they know we'd go right back to that builder and make noise -- that wouldn't be good for them! But it surely appears to be good for us! :-)

Photos

Front, just before completion
Rear elevation, roofing completed


My Construction Website


Login to Reply




Login to comment...
Copyright 1997-2020 Consensus Group Inc.