From $9.95



Syndication

Statistics

Users
Total: 32,922
Visited Last 30 days: 202
Forum Messages
Total: 20,966
Last 30 days: 5
Forum Evaluations
Total: 24,160
Last 30 days: 0
Journal Entries
Total: 5,400
Last 30 days: 7
Connections
Total: 15,247
Last 30 days: 4
Downloads
Total: 87,221

Journals

Name
NorthShoreBathrooms
19 Visits | 1 Posts | 2 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
616 Visits | 5 Posts | 4 Pix | 0 Videos
furnacerepairon St Catharines, AL
40 Visits | 1 Posts | 9 Pix | 0 Videos
furnacemkm Markham, AL
40 Visits | 1 Posts | 7 Pix | 0 Videos
vallejocleaningservi... Vallejo , CA
39 Visits | 1 Posts | 1 Pix | 0 Videos
getpestcontrol Delhi, AL
43 Visits | 1 Posts | 1 Pix | 0 Videos
noithattrieugia tphcm, AL
58 Visits | 1 Posts | 0 Pix | 0 Videos
httpownerbuilderbook...
125 Visits | 1 Posts | 0 Pix | 0 Videos
Packers-and-Movers Delhi, AL
397 Visits | 2 Posts | 1 Pix | 0 Videos
Best-Access-Doors Jackson, AL
174 Visits | 1 Posts | 0 Pix | 0 Videos
Concrete-Contractors...
237 Visits | 2 Posts | 0 Pix | 0 Videos
bird Springfield, MO
170 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
120,452 Visits | 1,004 Posts | 2,581 Pix | 47 Videos
Drywall-Repair-Lehi
249 Visits | 1 Posts | 0 Pix | 0 Videos
ianpundt
289 Visits | 1 Posts | 0 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
626 Visits | 2 Posts | 2 Pix | 0 Videos
httpswwwfaxitfastcom... salt lake city, AL
255 Visits | 1 Posts | 0 Pix | 0 Videos
Owning-My-First-Prop... Grand Rapids, MI
378 Visits | 1 Posts | 0 Pix | 0 Videos
movers-and-packers Hyderabad, AL
367 Visits | 1 Posts | 1 Pix | 0 Videos
Investment-Propertie... Rochester, MN
420 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

Just wanted to say your book has had a huge impact on our plans. We are building a large custom home… and your book convinced us to take on the job as owner-builders! I’ve read through it several times and have gained a lot of confidence from its pages.
Mike in Orange County, CA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Jeff in Hartland, WI's Journal Entries


Click here to create your own construction journal.

Posted by Jeff in Hartland, WI on 11/15/2008

The framers pretty much finished the second-floor walls, added soffits on the first floor in the kitchen and laundry room. They also lowered the ceiling in the front hallway. So they're essentially finished until the trusses--which were delayed by another day--are delivered on Monday. This weekend, I'll start caulking. I'll be filling every gap I can find in the framing, making sure that I eliminate every air gap that I can even before the insulation goes in.

We'll also try to figure out how we're going to store the interior doors. We got a good price on flat-panel cherry doors made by the Wausau Door Company here in Wisconsin. We'll use five-panel doors that are similar to those on our old house. We ordered them from Home Depot, hoping it would take them a while longer to get them to us. They arrived on Wednesday--two weeks ahead of schedule. We could store them in the workshop, but it's still pretty wet down there--the slabs above and below are still drying out. So we'll have to find a conditioned storage unit to store them in for a month or two. I'll be glad when the house is fully enclosed with a roof, windows, exterior doors, etc. But that's still a few weeks off...

It's been raining pretty consistently: every day for the last week. When I checked things with a moisture meter last weekend, the walls were pretty good--about 10% to 12% moisture content. The subfloors? Not so good. They soak up water like a sponge, so they are at 25% and up. The ideal here in the winter is 7%. If things are much wetter than that, I'll risk cracks in the drywall and cupped floors. So it looks like I'll have to get the heat turned on as soon as I can just to start drying things out before the insulation goes in. Next week will hopefully be much better in terms of weather. Not much rain expected, just a little bit of snow early in the week. By this time next week, the roof should be framed. Roofers should be able to start late next week or early the week after, along with the mechanicals. The power company was out to mark for the gas line and to install the electric meter today. I had hoped they'd start digging yesterday. But with my luck, they'll arrive at the same time as the trusses or the crane early next week. More entries at mackayhouse.blogspot.com

Photos

The back of the house
Exterior walls going up
The front of the house
The garage
Interior walls are up.
Workshop stairs. No more climbing through the window...


My Construction Website


Login to Reply




Login to comment...
Copyright 1997-2020 Consensus Group Inc.