From $9.95



Syndication

Statistics

Users
Total: 28,335
Visited Last 30 days: 152
Forum Messages
Total: 20,592
Last 30 days: 11
Forum Evaluations
Total: 24,093
Last 30 days: 16
Journal Entries
Total: 4,942
Last 30 days: 15
Connections
Total: 15,015
Last 30 days: 17
Downloads
Total: 76,118

Journals

Name
The-Last-Rodeo Angel Fire, NM
14,898 Visits | 90 Posts | 96 Pix | 2 Videos
My-first-home
9 Visits | 1 Posts | 1 Pix | 0 Videos
7th-and-last-Home-bu... Saratoga Springs, UT
16 Visits | 1 Posts | 6 Pix | 0 Videos
Tanglewood Colorado Springs, CO
104,878 Visits | 882 Posts | 2,342 Pix | 42 Videos
Bruce Fowlerville, MI
30 Visits | 1 Posts | 0 Pix | 0 Videos
697-Marlin Austin/McDade, TX
4,494 Visits | 62 Posts | 508 Pix | 0 Videos
Sparky New Harmony, UT
60 Visits | 1 Posts | 1 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
63,817 Visits | 170 Posts | 512 Pix | 3 Videos
Mutton-Busting Nashville, TN
5,364 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
40,489 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
833 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
787 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
25,019 Visits | 41 Posts | 119 Pix | 0 Videos
wumifoso
1,661 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
1,526 Visits | 1 Posts | 4 Pix | 2 Videos
Insulationstop Latham, NY
1,530 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
1,714 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
35,901 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
1,626 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
3,509 Visits | 2 Posts | 2 Pix | 0 Videos
See all journals...

Just wanted to say the new website design looks fantastic and is really functional. Great work!
Larry Trom

Stan in Knoxville, TN's Journal Entries


Click here to create your own construction journal.

Posted by Stan in Knoxville, TN on 3/21/2007

Well, it's probably obvious we've been busy. We're finishing the inside and the exterior steps and porches. Cabinets are next, then final painting, plumbing and electric. Subs have been great, no problems (none). We have gone over budget in some places, some due to us, some out of our control. I'll post inside photos after cabinets are in.   Stan

Photos




Login to Reply




Login to comment...

Search



Copyright 1997-2016 Consensus Group Inc.