From $9.95



Syndication

Statistics

Users
Total: 30,606
Visited Last 30 days: 176
Forum Messages
Total: 20,738
Last 30 days: 26
Forum Evaluations
Total: 24,149
Last 30 days: 1
Journal Entries
Total: 5,240
Last 30 days: 16
Connections
Total: 15,142
Last 30 days: 5
Downloads
Total: 81,207

Journals

Name
Tanglewood Colorado Springs, CO
112,108 Visits | 934 Posts | 2,433 Pix | 42 Videos
The-Last-Rodeo Angel Fire, NM
22,734 Visits | 242 Posts | 361 Pix | 4 Videos
LalcoInteriors1 Mumbai, AL
17 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
965 Visits | 32 Posts | 46 Pix | 0 Videos
Stan-Tol Winter Springs, FL
85 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
328 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
143 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
106 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
221 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
286 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,145 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,376 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
345 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
372 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
509 Visits | 1 Posts | 0 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
1,104 Visits | 3 Posts | 1 Pix | 0 Videos
Our-log-home Thomaston, GA
1,010 Visits | 2 Posts | 4 Pix | 0 Videos
697-Marlin Austin/McDade, TX
6,411 Visits | 63 Posts | 508 Pix | 0 Videos
skiddinginbroadside Livermore, AL
915 Visits | 1 Posts | 0 Pix | 0 Videos
thedaniels Graham, WA
969 Visits | 5 Posts | 5 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

Love your site, been building for ten years now, but getting there - should be in this spring.
Mike P. Hopkinton MA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Stan in Knoxville, TN's Journal Entries


Click here to create your own construction journal.

Posted by Stan in Knoxville, TN on 12/25/2006

We have been waiting for the electric rough-in for two weeks. Plumbing, HVAC, fireplace and roof are finished. All inspections should be done next week ready for insulation. All is going well. We drove 8 hrs last weekend to the Kraftmaid warehouse, got about half of what we need. One more trip and we will buy the rest from the local store.

Photos



Posted by Lori in Reno, NV on 12/26/2006

Lori's Forum Posts: 122
Journal Entries: 89
Interview Answers: 202

Private Message

My Construction Website


Image from Lori's blog
12/26/2006

The picutre looks beautiful what a view.

May I ask how big is your kitchen and how many cabinets did you buy. What did it cost you?

Thanks Lori

Posted by Stan in Knoxville, TN on 12/27/2006

Stan's Forum Posts: 3
Journal Entries: 11
Interview Answers: 65

Private Message


Image from Stan's blog
12/27/2006
Lori, The kitchen is fairly large with approx. 30 feet of cabinets. We'll need about 32 cabinets total. Our trip to Kraftmaid netted about half of that with a cost to us of $2300 which I priced at Home Depot for $5200. We're making another trip in Jan.   Stan
Posted by Kristen in Snowflake, AZ on 1/3/2007

Kristen's Forum Posts: 19
Journal Entries: 5
Interview Answers: 59

Private Message

My Construction Website


Kristen's Selected Image
1/3/2007

Hi Stan,

Would you mind posting the square footage of your house and a floor plan?  It sure looks nice so far.  Don't worry, I'm not interested in stealing your plan. ;-)  We're already under way (on the stem wall) of our own.  I'm just interested how you used your space on the main floor.

Thanks,

Kristen

(The_Cortes_Adventure)

Posted by Stan in Knoxville, TN on 1/3/2007

Stan's Forum Posts: 3
Journal Entries: 11
Interview Answers: 65

Private Message


Image from Stan's blog
1/3/2007
Kristen, Our house is a Stephen Fuller (#141 on his site) 2902 sq. ft.. We are building on a crawl space but we reversed the stairs in the attic where we have an other 1500 sq. ft. unfinished.   Hope your home is going well.  Stan
Posted by Kristen in Snowflake, AZ on 1/5/2007

Kristen's Forum Posts: 19
Journal Entries: 5
Interview Answers: 59

Private Message

My Construction Website


Kristen's Selected Image
1/5/2007

Thanks for the info. Stan. 

Happy Building,

Kristen

Posted by Nick in Goochland, VA on 1/22/2007

Nick's Forum Posts: 3

Private Message


Randomly Selected Image
1/22/2007
Your house looks very nice. If you don't mind me asking, what kind of framing costs did you run into with your roof? My wife and I are in the planning stages of a house with a similar roof line (although smaller). We've talked to a couple of builders and they have all told us that the framing for the roof is going to be very expensive. Thanks!
Posted by Stan in Knoxville, TN on 1/22/2007

Stan's Forum Posts: 3
Journal Entries: 11
Interview Answers: 65

Private Message


Image from Stan's blog
1/22/2007
Nick, Maybe we were very lucky but I think we did will. The house has a little over 2900 sq. ft. and some unusual ceilings, 9' to 11' tray in master bedroom, 15' tray in living room, 17' den and a 22' dining room. About 1500 sq. ft. usable footage in the attic (unfinished). The lumber package was about $26000 in the dry (no shingles) and the framer charged me $5.00 a sq. ft. including the garage( about 3350 sq. ft. total).  That did not include placing 32 windows and 3 exterior doors which was about $1500. The framer dried this in 8-9 days. If we can be any help don't hesitate. We ask for a lot of help about we started.   Stan

Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.