From $9.95



Syndication

Statistics

Users
Total: 32,602
Visited Last 30 days: 170
Forum Messages
Total: 20,954
Last 30 days: 39
Forum Evaluations
Total: 24,160
Last 30 days: 0
Journal Entries
Total: 5,386
Last 30 days: 4
Connections
Total: 15,242
Last 30 days: 1
Downloads
Total: 86,756

Journals

Name
Packers-and-Movers Delhi, AL
236 Visits | 2 Posts | 1 Pix | 0 Videos
Best-Access-Doors Jackson, AL
38 Visits | 1 Posts | 0 Pix | 0 Videos
Concrete-Contractors...
94 Visits | 2 Posts | 0 Pix | 0 Videos
bird Springfield, MO
52 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
119,586 Visits | 1,004 Posts | 2,581 Pix | 47 Videos
Drywall-Repair-Lehi
118 Visits | 1 Posts | 0 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
442 Visits | 2 Posts | 2 Pix | 0 Videos
ianpundt
136 Visits | 1 Posts | 0 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
460 Visits | 2 Posts | 2 Pix | 0 Videos
httpswwwfaxitfastcom... salt lake city, AL
126 Visits | 1 Posts | 0 Pix | 0 Videos
Owning-My-First-Prop... Grand Rapids, MI
223 Visits | 1 Posts | 0 Pix | 0 Videos
movers-and-packers Hyderabad, AL
210 Visits | 1 Posts | 1 Pix | 0 Videos
Investment-Propertie... Rochester, MN
259 Visits | 1 Posts | 0 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
26,920 Visits | 271 Posts | 435 Pix | 4 Videos
E2custom
855 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
819 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
50,260 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
863 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
813 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
861 Visits | 1 Posts | 1 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

Let me congratulate you on the owner-builder website - LOTS & LOTS of valuable information. I recently purchased the fourth edition O-B Book and found out about the website from that.
Richard B. Milwaukee, WI

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Corestone in Tomball, TX's Journal Entries


Click here to create your own construction journal.

Posted by Corestone in Tomball, TX on 5/6/2019 5:38:24 PM

For some projects, Corestone Paving and Construction is employed as not solely the asphalt paving contractor, however the overall contractor likewise. On these jobs, we've got the chance to figure closely with the consumer and also the engineering firm to make a car parking zone from the specifications provided and produce a project full circle.

The Church was in would like of a car parking zone update. this ton had reached the purpose of its era wherever the utilization of preventative maintenance techniques wasn't an choice. because the church started the method of a car parking zone reconstruction project, they were enlightened of extra storm water management needs. The scope had currently accumulated to incorporate car parking zone reconstruction likewise as developing AN upgraded storm water management system, including putting in erosion management techniques, multiple catch basins and a replacement retentive pool.

Corestone’s excavating crews need to work right once the Fourth of Gregorian calendar month vacation last summer. the primary task was to get rid of the prevailing asphalt pavement and eliminate it. From there, we have a tendency to may take away the prevailing wall, concrete sidewalks, curb and gutter, storm pipe, and landscaping. As a part of the project, electrical poles conjointly had to be removed. Once everything was removed, we have a tendency to had a opportunity to begin over and build the new storm water management system, one that may tie into the roof drains and down spouts. additionally, concrete sidewalks and curb and gutter were put in.

The grading crew was up next. so as to produce a solid base for the asphalt, category five combination was put in and installed to actual specifications. this permits for the correct emptying from storm water runoff.

Finally, it absolutely was our asphalt paving team’s time to shine. The project was paved in 2 phases, initial with a 2” asphalt base elevate put in. And then, the 2” asphalt wear course was paved, totaling nearly three,600 SF of asphalt. As a part of the project, and to become ADA compliant, the car parking zone was needed to own upgraded assemblage put in.

Throughout the project, the Church, was terribly concerned. They explicit , “The Church is extraordinarily pleased with their stunning car parking zone created by the laborious operating men and girls of Corestone Paving and Construction.” He went on to mention, “Corestone completed the project on time, encircled by a busy parish community and faculty. we have a tendency to appreciate their skilled angle and useful suggestions.”

It is our pleasure to assist customers at any purpose in their project, whether or not it’s a pavement assessment to see the proper course of action, or being the right choice of 
paving companies, wherever we have a tendency to handle all of the project details.
For many years, Corestone Paving has helped churches throughout the Houston space with a good array of asphalt pavement services. must get started? decision United States at 281-651-0616 or complete letter of invitation for consultation kind and we’d be happy to produce you with a free estimate.

My Construction Website


Login to Reply




Login to comment...
Copyright 1997-2020 Consensus Group Inc.