From $9.95



Syndication

Statistics

Users
Total: 31,149
Visited Last 30 days: 144
Forum Messages
Total: 20,771
Last 30 days: 9
Forum Evaluations
Total: 24,154
Last 30 days: 0
Journal Entries
Total: 5,297
Last 30 days: 12
Connections
Total: 15,167
Last 30 days: 4
Downloads
Total: 82,474

Journals

Name
Tanglewood Colorado Springs, CO
113,680 Visits | 954 Posts | 2,486 Pix | 42 Videos
The-Last-Rodeo Angel Fire, NM
24,068 Visits | 266 Posts | 426 Pix | 4 Videos
Z-Oen Dayton, OH
4 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
675 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
63 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
54 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
69 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
108 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
135 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
868 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
172 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
152 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,322 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
169 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
254 Visits | 1 Posts | 0 Pix | 0 Videos
Metal-Buildings Conroe, TX
355 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
320 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
405 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
500 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,637 Visits | 40 Posts | 177 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Steve0.002
James in Beaumont, TX0.002
Timmy Weeks0.001

I have just recently decided to "join" the O-B movement and have read The Owner-Builder Book (great reading). I also signed up on this website.
Larry in Clarksville, TN

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 8/30/2018

Drove up to Pueblo Wednesday to pick up the stone order at the distributor that finally arrived.  Stone for the downstairs fireplace, stone for the top of the outdoor fireplace and stone for the door thresholds.  So now it’s time to get to work on it.


Started running the downstairs fireplace today.  Got it up to the level of the hearth and will let it set overnight so the thinset can cure.  Will set the wood hearth on it tomorrow and begin to move up on the stone.

Thresholds will be next.  Get those finished and we’re closer to a final inspection as well as an inspection for the architectural compliance.  I need the latter to get our deposit back.  

I got a small load of steel on Tuesday.  Some 1/2” square tubing and flat stock.  A piece of flat will be used on one last barn door, bit the other was ised to make a cover grate for the sewer pump.  The pump is at the bottom of a 4’ diameter culvert.  I have needed to get it done for some time so no one can fall in.  Took about an hour to build, cutting the steel and welding it all together.  Another item taken care of.

Sandra and I have been  working on the rough cut lumber, even though it hasn’t fully dried.  Got the shelving cut to length, then I used a powered hand planer to get it semi-smooth.  Then Sandra takes the orbital sander to it.  The 1x material has dried pretty quickly, as one would expect.  I keep reversing the exposure to minimize cupping.  Weathering has taken place on several and lacquer is going on.  

I’ve gotten all of the 6x6 planed, as well as quite a bit of the 2x6.  These I’ve used the planer to try to create a look of handscraping.  We’ll see how well it turns out. It’d be neat to begin the first bunk bed in a couple weeks.  

And lastly, we set the backsplash on the downstairs kitchen.  Took a day to get it up.
Sandra has since grouted it.  It’s white subway tile and brightens up that level a lot.  

So, a lot of things in the works, and one has gotten finished.


Photos

Sandra sanding on the shelf boards
Backsplash going up
Grate being made
Grate finished and in place
Some of the 1x material up drying
One other thing that got done was connecting a propane line to a new griddle, eliminating the need for a refillable tank.
A beautiful sunset tonight over the mountains.



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.