From $9.95



Syndication

Statistics

Users
Total: 32,148
Visited Last 30 days: 110
Forum Messages
Total: 20,888
Last 30 days: 10
Forum Evaluations
Total: 24,158
Last 30 days: 0
Journal Entries
Total: 5,364
Last 30 days: 2
Connections
Total: 15,226
Last 30 days: 3
Downloads
Total: 85,796

Journals

Name
Tenants-Right-When-S... Maryland, MD
52 Visits | 1 Posts | 2 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
89 Visits | 1 Posts | 1 Pix | 0 Videos
Tanglewood Colorado Springs, CO
117,875 Visits | 999 Posts | 2,572 Pix | 47 Videos
The-Last-Rodeo Angel Fire, NM
26,160 Visits | 271 Posts | 435 Pix | 4 Videos
E2custom
511 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
484 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
49,829 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
512 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
484 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
517 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
2,249 Visits | 34 Posts | 52 Pix | 0 Videos
Vintage-Oaks-Cabin New Braunfels, TX
871 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
642 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
1,436 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
711 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
711 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
739 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
700 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
776 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,471 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Sally0.001

Let me congratulate you on the owner-builder website - LOTS & LOTS of valuable information. I recently purchased the fourth edition O-B Book and found out about the website from that.
Richard B. Milwaukee, WI

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 8/21/2018 10:00:59 PM

Sandra has had the fun, not, of grouting the tile we set in the main kitchen.  Unlike most standard tiles, this has a very deep inset profile around the edge of each one.  Like a good 1/4” deep by 1/2” wide.  She tried using a grout bag, like a pastry bag only larger, but it didn’t really work.  So she is using her fingers to work the grout in without filling the entire depression.  A slow process, but she has now finished two sections, one more to go.  


I’ve been continuing to work on door trim.  I think it’s nearly finished, but I’m short a couple boards.  Do I, order a bit more aspen? Or try using spruce.  I’ll ponder it a bit. But the crown moulding on top is just about finished.  It’s gone reasonably well, if only, I could measure correctly.  

I went and picked up an order of rough cut lumber at the mill this morning.  Took my 10’ trailer.  I didn’t realize just how heavy the order would be.  From my estimates when I unloaded each piece, I probably had close to 3000# on a trailer designed for 1500#.  Some pieces were so long they nearly dragged the ground.  But we made it home in good order.  I unloaded and spread it out to dry, and then the skies opened up. Oh well. This load is going to be planed but in keeping with a more handhewned style.  Most of it is going towards four bunkbeds, some for a couple large coffee tables, and some for exposed shelving in both kitchens.  Plenty of work to do once it dries.  I figure about a month and we can begin working it.

Waiting on the stone for the lower fireplace.  It’s in Denver now, distributor in Pueblo, CO can’t spare a truck to pick it up just yet as one of theirs is broken.  They asked if I could go and get it in Denver. An extra 3-4 hours that would be added to a 7 hour trip already. No thanks! Hopefully. They can get it within a week.

The car lift got a good workout this past weekend.  Daughter in Denver drove down for me to install skid plates and rock sliders (heavy duty guards that take them place of running boards) on her 4-Runner.  Seems she is getting into trail riding since she moved west!

Should be able to tile the lower kitchen backsplash over the weekend.  Using subway tile on it so grouting should be much easier when Sandra works on it. All in all, things keep progressing!

Photos

Sandra grouting the second wall section. You can see she is working it in by hand
A closeup of the crown moudling detail around each door. This adds six pieces of trim to each interior door.
The load of rough cut lumber. 2x6, 2x12, 6x6, and 1x6.
Laying it out to dry.


Posted by Kelsey Jo on 8/22/2018

Kelsey Jo's Forum Posts: 0

Private Message


Randomly Selected Image
8/22/2018
Order more aspen.  If you go around and count, I bet there is more upper door trim still missing than you think (I think my bathroom, closet, bedroom, etc all were missing pieces).

KJ

Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.