From $9.95



Syndication

Statistics

Users
Total: 32,148
Visited Last 30 days: 110
Forum Messages
Total: 20,888
Last 30 days: 10
Forum Evaluations
Total: 24,158
Last 30 days: 0
Journal Entries
Total: 5,364
Last 30 days: 2
Connections
Total: 15,226
Last 30 days: 3
Downloads
Total: 85,796

Journals

Name
Tenants-Right-When-S... Maryland, MD
52 Visits | 1 Posts | 2 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
89 Visits | 1 Posts | 1 Pix | 0 Videos
Tanglewood Colorado Springs, CO
117,877 Visits | 999 Posts | 2,572 Pix | 47 Videos
The-Last-Rodeo Angel Fire, NM
26,163 Visits | 271 Posts | 435 Pix | 4 Videos
E2custom
511 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
484 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
49,829 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
513 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
486 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
517 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
2,249 Visits | 34 Posts | 52 Pix | 0 Videos
Vintage-Oaks-Cabin New Braunfels, TX
871 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
642 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
1,436 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
712 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
711 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
739 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
700 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
776 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,471 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Sally0.001

Mark - Well, this is a surprise. Does the award go to the wordiest post? If so, I can certainly appreciate why I won!
Glenn M., Golden, CO

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 8/7/2018 11:44:55 PM

We continue to make progree on the trim.  The door casing should be finished by the end of the weekend with only the crown moilding portion left to finish.  That won’t be done until we after get a final inspection, as we are working hard to get the required things done to get that. Those things include all of the normal trim, exterior thresholds and top rails on the deck railings. 


I’ll head to big blue today for redwood 2x6 lumber to make those top rails.  Sandra has also been preparing several live edge planks that will also be used for top rails where we want to have more of a gathering place on the decks.  The live edge rails will allow room for drinks to be set down in a more attractive setting.  

The railing for the retaining wall is up, the stucco work an the retaining wall and in the window well is finished.

I’ve finally decided to use the stone we used for window sills for the thresholds and have a plan on how to attach them.  I need to find out if they are in stock at any of the local (3 hour drive local) yards.

The 3rd floor outdoor patio space is finished with the addition of a great coffee table that Sandra made.  It’s been wonderful to sit out there in the evenings watching the sunset and the fireplace.  I’ve ordered a radiant heater to add warmth. The fireplace puts out quite a bit, but if the wind is blowing, it doesn’t get far.  The 9’ long radiant unit will hang from the beam and provide significant additional warmth.

All of the bedrooms have been finished, complete with beds and bedding.  We had recently received the last two log beds we had ordered.  They were a bear to get in the house. The crate they arrived in weighed almost 900 lbs with the pallet. The headboards alone weighed about 200 lbs each.  As with everything else bulky or heavy, the beds were loaded on the Skytrak and lifted up.  But from there we had to stand the head and foot boards on furniture dollies to move to the respective bedrooms.  Crazy, but there are in and look great.

Photos

Outdoor space with Sandra’s coffee table finished and in.
Guest level living area. Waiting on stone for the fireplace. But based on the outdoor one we just finished, it should take a day or two only to install the stone here
One of the guest bedrooms. Ready for company!



Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.