From $9.95



Syndication

Statistics

Users
Total: 31,336
Visited Last 30 days: 157
Forum Messages
Total: 20,804
Last 30 days: 15
Forum Evaluations
Total: 24,154
Last 30 days: 0
Journal Entries
Total: 5,309
Last 30 days: 1
Connections
Total: 15,181
Last 30 days: 13
Downloads
Total: 83,087

Journals

Name
MesaBarnHouse Mesa, AZ
1,523 Visits | 34 Posts | 52 Pix | 0 Videos
Tanglewood Colorado Springs, CO
114,457 Visits | 961 Posts | 2,500 Pix | 42 Videos
The-Last-Rodeo Angel Fire, NM
24,638 Visits | 269 Posts | 433 Pix | 4 Videos
Vintage-Oaks-Cabin New Braunfels, TX
387 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
127 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
859 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
186 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
178 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
209 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
227 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
256 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
999 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
295 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
266 Visits | 1 Posts | 0 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
285 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
367 Visits | 1 Posts | 0 Pix | 0 Videos
Metal-Buildings Conroe, TX
503 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
474 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
527 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
619 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

I appreciate your free hosting of our weblog.
Brian H.

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 4/27/2018 9:55:22 AM

The granite guys came back yesterday and finally finished the last two shower curbs.  With that I can get a full set of exact measurements and order the glass.  It’ll take about a month to receive it here.  


The beams we received camestained in a shade that did not fit anything we had going on. Instead of a walnut, they came in a very reddish brown.  Sandra sanded and redid with something that should be a better fit and once fully dry we’ll try to get them up next week.  Although hollow, they are still pretty heavy, and almost 30’ long once assembled together.  I’ll need some help for this job.

The past couple days I’ve slowed on the stairs as Sandra stains and lacquers the handrails and I wait for some deburring bits to clean up the welds.  Instead, got back on the kitchen to install cabinet lighting (LED strips) and get down the HORRIBLE business of running the crown moulding - a job I absolutely hate, especially when it’s as large as this - 6”, and there are so many changes in direction.  But it’s finally finished and sets off the cabinets well.  Today’s chore is to install the support legs on both islands for the overhang on each.  Included with that is a piece of angle iron along the length of the overhang to eliminate having to add a third leg in the middle.  The angle will hang from the top of the leg, being recessed to sit flush.  A piece of trim will then be glued to the angle to hide it.  Shouldn't’ be a hard job, but will take some time.  

Also need to trim the door frames on fourth floor doors so we can take them up and set them in place and Sandra can use the wood treatment on them.  All in all, a full days work ahead of me.


Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.