From $9.95



Syndication

Statistics

Users
Total: 31,141
Visited Last 30 days: 146
Forum Messages
Total: 20,771
Last 30 days: 14
Forum Evaluations
Total: 24,154
Last 30 days: 1
Journal Entries
Total: 5,293
Last 30 days: 9
Connections
Total: 15,165
Last 30 days: 6
Downloads
Total: 82,463

Journals

Name
Z-Oen Dayton, OH
0 Visits | 1 Posts | 0 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
24,028 Visits | 265 Posts | 422 Pix | 4 Videos
Tanglewood Colorado Springs, CO
113,591 Visits | 951 Posts | 2,473 Pix | 42 Videos
washougalhome Washougal, WA
665 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
59 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
48 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
64 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
102 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
129 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
861 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
167 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
147 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,309 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
165 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
245 Visits | 1 Posts | 0 Pix | 0 Videos
Metal-Buildings Conroe, TX
346 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
314 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
397 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
493 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,620 Visits | 40 Posts | 177 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
James in Beaumont, TX0.002
Timmy Weeks0.001
Steve0.002

I like the new features. The site looks much more tidy and organized. Good work. [giving a thumbs up :)]
Phil in Gainesville, FL

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Amanda in Mesa, AZ's Journal Entries


Click here to create your own construction journal.

Posted by Amanda in Mesa, AZ on 4/26/2018 9:42:58 AM

Two weeks ago my husband rented a trencher from a neighbor so we could lay the conduit from the house to the electrical pole on the road. I was excited for him to be working on it, that was until I realized we were going to have to dig the last few inches out of the hole! The whole was 4-5 inches wide and 39 inches deep. We spent a day and half doing this and it was miserable. On top of it being crappy work, it is also getting hot here (in the 90's that weekend). We got the conduit it and then we failed our electrical inspection with the electric company twice.... we had to dig more by the pole, add some bolts, pull the mule tape. Finally we passed with the electric company, then the county came out this week and they passed us also. Now we are waiting on the electric company to give us a date they will connect us. I was hoping it would be this week. We went spent a few hours this last weekend working on siding. We are getting so close, we just need to buckle down and get it done, but once again it has been hot and we have been getting burnt, so we get tired and decide to move to inside tasks :) We got all the vanities installed. Home depot and their subs have been a bit of a nightmare with the kitchen cabinets. We are waiting on a broken piece and an additional cabinet we had to order to fix the island. Counter company came out and measured last week and they should be ready to install late next week, so hopefully the cabinet people can get themselves together. We spent a full day hanging electrical fixtures (fans, can lights, vanity lights) I felt like we got a lot done that day. My cousin is helping us with the electrical panels, I am not sure how far along he is but the hubby said he had made good progress. We spent the morning at home depot on Monday (I have been taking days off here and there to try to get more done) and we picked a flooring (vinyl planks) for the loft and tile for the showers. We started the installing the loft flooring and are about 25% complete. We want to get this done this weekend so the wrought iron company that did the stairs can come install the railing asap. We are going to give our 30 days notice for May month end to be out of our rental. I am a little nervous, but things we need to focus on this weekend are finish installing the loft floor and work on electrical outlets/fixtures. I will try to be better about taking pictures this weekend.

Posted by Larry in Angel Fire, NM on 4/27/2018

Larry's Forum Posts: 1
Journal Entries: 265
Interview Answers: 67

Private Message


Larry's Selected Image
4/27/2018
Wow Amanda! I’m jealous!In 37 weeks you are where we are after two years!  Way to go!
Posted by Amanda in Mesa, AZ on 5/9/2018

Amanda's Forum Posts: 0
Journal Entries: 33
Interview Answers: 1

Private Message


Image from Amanda's blog
5/9/2018
Your house is looking great! I think you have done more of the work than us and I think yours is quite a bit bigger ;)

Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.