From $9.95



Syndication

Statistics

Users
Total: 30,956
Visited Last 30 days: 168
Forum Messages
Total: 20,752
Last 30 days: 6
Forum Evaluations
Total: 24,153
Last 30 days: 0
Journal Entries
Total: 5,271
Last 30 days: 6
Connections
Total: 15,157
Last 30 days: 7
Downloads
Total: 82,113

Journals

Name
The-Last-Rodeo Angel Fire, NM
23,563 Visits | 258 Posts | 406 Pix | 4 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
16 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
26 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
112,997 Visits | 943 Posts | 2,450 Pix | 42 Videos
Art-Camacho New Braunfels, TX
777 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
78 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
83 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,160 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
95 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
172 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
496 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
254 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
207 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
320 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
392 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,456 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,656 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
418 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
467 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
625 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


My wife and I are building in south Louisiana in a couple of years and are starting the planning already. Thanks, it is nice to know there is a place I can go for help out there.
Brandon in Lafayette, LA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 4/20/2018 1:50:37 PM

Tuesday was the day the granite guys were supposed to show up - and they did, although late because of an accident on the interstate.  Typical spring winds with 45 mph gusts were whistling when they got here.  There were 14 pieces of granite that had to be lifted to the 2nd and third floors which was accomplished with the Skytrack and a boom setup they had brought with them.  With ropes clamped to the bottom corners to steady each piece as I lifted it, we slowly and safely got them up to their respective floors.  We waited for a momentary calm and held our breath when lifting the main island panel that was over 5’ x 10’ but all went well and they set about getting the panels laid down.  A word of caution, make sure you’re present at all phases.  As I was busy running the Skytrack, and later work was going on two levels and you tend to be awed by the changes taking place and not paying attention as you should to the details they are doing, mistakes can happen.  For us they pulled back a piece of romex into the cabinetry that needed to be left hanging out through a groove I had made at the top of the cabinet.  Fortunately, by removing the dishwasher and a drawer in an adjacent cabinet, I had enough access to pull it back through.  And then yesterday, Sandra said “I can’t get the spice racks to pull out”. They flank the stove and with legs on front, they are made to look like cabinetry.  Well, they do look like it so well, the granite guys glued the countertop to them! Honest mistakeon their part, but if I had been watching more closely, I could have caught it as they were doing it.  Should be a relatively simple fix with an oscillating blade and a little time, but time thay could be spent elsewhere.  Moral of the story, watch their every move! 


Now, they still have to finish the shower curbs, which they had planned on doing before they left. But now the remaing pieces turn out to be too short and will have to be made again.  They have another job in town next week and will bring the new material with them and finish it. I hope.  It’s been over two months on a very simple and small job.  I am over this!

I’ve gotten the three kitchen sinks in and plumbed.  Need a supply line or two to finish them. But the faucets, airgaps and soap dispensers are all in. The master sinks have faucets set and supplied, but I need to get p traps and tail pieces to finish them.

Tuesday, the steel for the stair railings arrived.  Shipped up from Albuquerque.  The 1” tubing was cut into 8’ pieces and was covered with cutting fluid, so I had to wipe each down and then again with lacquer thinner.  Once welded up, I’ll clean once more before painting.

Sandra had been working on the live edge material a little at a time.  Made bench seats for the girl’s rooms and some shelving.  Just started on a top and shelf for the half bath sink. I need to come up with a support for those so they can float without haveing a cabinet.

Half of the doors arrive this afternoon.  They are for the third and fourth floors.  So we can continue to try to finish off those levels in out spare time;-))

Well time to go to work!


Photos

Lifting granite slabs one at a time.
Getting a slab ready to lift
The big one
Liftoff of the big one
Kitchen with granite done


Videos




Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.