From $9.95



Syndication

Statistics

Users
Total: 32,615
Visited Last 30 days: 170
Forum Messages
Total: 20,954
Last 30 days: 38
Forum Evaluations
Total: 24,160
Last 30 days: 0
Journal Entries
Total: 5,387
Last 30 days: 5
Connections
Total: 15,243
Last 30 days: 2
Downloads
Total: 86,786

Journals

Name
httpownerbuilderbook...
4 Visits | 1 Posts | 0 Pix | 0 Videos
Packers-and-Movers Delhi, AL
248 Visits | 2 Posts | 1 Pix | 0 Videos
Best-Access-Doors Jackson, AL
49 Visits | 1 Posts | 0 Pix | 0 Videos
Concrete-Contractors...
108 Visits | 2 Posts | 0 Pix | 0 Videos
bird Springfield, MO
62 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
119,640 Visits | 1,004 Posts | 2,581 Pix | 47 Videos
Drywall-Repair-Lehi
129 Visits | 1 Posts | 0 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
453 Visits | 2 Posts | 2 Pix | 0 Videos
ianpundt
148 Visits | 1 Posts | 0 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
474 Visits | 2 Posts | 2 Pix | 0 Videos
httpswwwfaxitfastcom... salt lake city, AL
137 Visits | 1 Posts | 0 Pix | 0 Videos
Owning-My-First-Prop... Grand Rapids, MI
236 Visits | 1 Posts | 0 Pix | 0 Videos
movers-and-packers Hyderabad, AL
227 Visits | 1 Posts | 1 Pix | 0 Videos
Investment-Propertie... Rochester, MN
274 Visits | 1 Posts | 0 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
26,951 Visits | 271 Posts | 435 Pix | 4 Videos
E2custom
869 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
832 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
50,279 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
876 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
831 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

I downloaded the Planning Steps spreadsheet from your Free Software Gallery. It was incredibly helpful. Thanks.
Mark in Orlando, FL

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 2/28/2018 9:33:11 AM

Ray and I spent the last two days putting in the flooring on the main living area.  And it’s done.  Actually begins to finish off the look of the place!  Sandra and I started the china hutch cabinetry that fits along the north wall.  We need to look for the rest of the pieces today and try to finish that off.  Will also begin putting together the replacement wall cabinets so we can begin to set those.  Sinks and dishwashers arrived yesterday. 


Inspector came out on Monday to review the downstairs venting for the fireplace and passed it. So I can go ahead and close the ceiling back up, tape and mud it and Sandra can repaint.   But that’ll take a backseat to working on the cabinetry.  Only thing left on the plumbing is the final, which will require all of the vanities and sinks to be connected. 

Granite guys are to come back today to do the stuff they have had ready for a few weeks now.  Once we have the cabinets done, they can come back and template for the rest of the job.

Got door quotes back and need to sort through them.  We’ll probable make a few changes to eliminate some custom widths as they came in hugely expensive.



Login to Reply




Login to comment...
Copyright 1997-2020 Consensus Group Inc.