From $9.95



Syndication

Statistics

Users
Total: 30,472
Visited Last 30 days: 168
Forum Messages
Total: 20,714
Last 30 days: 6
Forum Evaluations
Total: 24,148
Last 30 days: 0
Journal Entries
Total: 5,221
Last 30 days: 19
Connections
Total: 15,137
Last 30 days: 2
Downloads
Total: 80,843

Journals

Name
The-Last-Rodeo Angel Fire, NM
22,416 Visits | 236 Posts | 358 Pix | 4 Videos
MesaBarnHouse Mesa, AZ
868 Visits | 32 Posts | 46 Pix | 0 Videos
Stan-Tol Winter Springs, FL
38 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
251 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
97 Visits | 1 Posts | 1 Pix | 0 Videos
Tanglewood Colorado Springs, CO
111,760 Visits | 925 Posts | 2,426 Pix | 42 Videos
benson-bondstone-hom... Coeur d'Alene, AL
59 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
177 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
242 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,049 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,227 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
306 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
333 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
452 Visits | 1 Posts | 0 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
1,009 Visits | 3 Posts | 1 Pix | 0 Videos
Our-log-home Thomaston, GA
931 Visits | 2 Posts | 4 Pix | 0 Videos
697-Marlin Austin/McDade, TX
6,301 Visits | 63 Posts | 508 Pix | 0 Videos
skiddinginbroadside Livermore, AL
854 Visits | 1 Posts | 0 Pix | 0 Videos
thedaniels Graham, WA
914 Visits | 5 Posts | 5 Pix | 0 Videos
Cabin-Addition--Spra... Austin, TX
832 Visits | 1 Posts | 5 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

Follow the guidelines in The Owner-Builder Book. I recommend it to lots of people.
Jedda in Brighton. ON

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 2/20/2018

Tubs and associated plumbing for the fourth floor all came in water tight. Got the two vanities on the same floor installed, with final hookups yet to do.


Started finishing the kitchen ceiling that the stone guy started some months back.  We had to wait to finish until the tubs were in upstairs, which had to wait until the floors were in.  Long runs of aspen T&G which are mostly not really straight.  So takes some significant time and two people, they being Sandra and I.

Monday we should start on the remaining wood floor on the 3rd floor -  kitchen dining room and great room.  About 1800 sq f.t worth.

Remaining vent pipes for the second floor fireplace came yesterday and I got them set today.  Inspector is to come back on the 22nd, but I’d better give him a shout to confirm.

Sandra ordered kitchen sinks, and dishwashers.  Second floor sink and dishwasher can get installed when they arrive.  Third floor once we get the floor and cabinets installed. We made a list of all the doors and have started to go out for bids.  A total of 28 doors.  

The granite guys are supposed to come back Saturday and do the install on the shower curbs, and 2nd floor vanities. 

Ray found a couple more things to add to the fireplace to take away from the stark top. They certainly do!

Things are moving along!




Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.