From $9.95



Syndication

Statistics

Users
Total: 32,082
Visited Last 30 days: 110
Forum Messages
Total: 20,878
Last 30 days: 2
Forum Evaluations
Total: 24,158
Last 30 days: 0
Journal Entries
Total: 5,362
Last 30 days: 5
Connections
Total: 15,225
Last 30 days: 7
Downloads
Total: 85,581

Journals

Name
Tanglewood Colorado Springs, CO
117,560 Visits | 999 Posts | 2,572 Pix | 47 Videos
The-Last-Rodeo Angel Fire, NM
26,055 Visits | 271 Posts | 435 Pix | 4 Videos
E2custom
463 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
431 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
49,754 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
464 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
430 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
463 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
2,182 Visits | 34 Posts | 52 Pix | 0 Videos
Vintage-Oaks-Cabin New Braunfels, TX
826 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
596 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
1,386 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
653 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
663 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
680 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
657 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
709 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,422 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
732 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
663 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Sally0.001

Nice changes to the website. Thank you!
Julie Casey

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 2/20/2018

Tubs and associated plumbing for the fourth floor all came in water tight. Got the two vanities on the same floor installed, with final hookups yet to do.


Started finishing the kitchen ceiling that the stone guy started some months back.  We had to wait to finish until the tubs were in upstairs, which had to wait until the floors were in.  Long runs of aspen T&G which are mostly not really straight.  So takes some significant time and two people, they being Sandra and I.

Monday we should start on the remaining wood floor on the 3rd floor -  kitchen dining room and great room.  About 1800 sq f.t worth.

Remaining vent pipes for the second floor fireplace came yesterday and I got them set today.  Inspector is to come back on the 22nd, but I’d better give him a shout to confirm.

Sandra ordered kitchen sinks, and dishwashers.  Second floor sink and dishwasher can get installed when they arrive.  Third floor once we get the floor and cabinets installed. We made a list of all the doors and have started to go out for bids.  A total of 28 doors.  

The granite guys are supposed to come back Saturday and do the install on the shower curbs, and 2nd floor vanities. 

Ray found a couple more things to add to the fireplace to take away from the stark top. They certainly do!

Things are moving along!




Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.