From $9.95



Syndication

Statistics

Users
Total: 32,214
Visited Last 30 days: 103
Forum Messages
Total: 20,888
Last 30 days: 0
Forum Evaluations
Total: 24,158
Last 30 days: 0
Journal Entries
Total: 5,364
Last 30 days: 0
Connections
Total: 15,229
Last 30 days: 3
Downloads
Total: 85,998

Journals

Name
Tenants-Right-When-S... Maryland, MD
110 Visits | 1 Posts | 2 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
155 Visits | 1 Posts | 1 Pix | 0 Videos
Tanglewood Colorado Springs, CO
118,222 Visits | 999 Posts | 2,572 Pix | 47 Videos
The-Last-Rodeo Angel Fire, NM
26,334 Visits | 271 Posts | 435 Pix | 4 Videos
E2custom
574 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
549 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
49,913 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
576 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
540 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
583 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
2,337 Visits | 34 Posts | 52 Pix | 0 Videos
Vintage-Oaks-Cabin New Braunfels, TX
929 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
703 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
1,513 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
773 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
774 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
815 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
762 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
839 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,534 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Sally0.001

I'm having fun building so far!!! Thanks for having the website and the book. You got me started.
AG in Colorado Springs

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 2/20/2018

Tubs and associated plumbing for the fourth floor all came in water tight. Got the two vanities on the same floor installed, with final hookups yet to do.


Started finishing the kitchen ceiling that the stone guy started some months back.  We had to wait to finish until the tubs were in upstairs, which had to wait until the floors were in.  Long runs of aspen T&G which are mostly not really straight.  So takes some significant time and two people, they being Sandra and I.

Monday we should start on the remaining wood floor on the 3rd floor -  kitchen dining room and great room.  About 1800 sq f.t worth.

Remaining vent pipes for the second floor fireplace came yesterday and I got them set today.  Inspector is to come back on the 22nd, but I’d better give him a shout to confirm.

Sandra ordered kitchen sinks, and dishwashers.  Second floor sink and dishwasher can get installed when they arrive.  Third floor once we get the floor and cabinets installed. We made a list of all the doors and have started to go out for bids.  A total of 28 doors.  

The granite guys are supposed to come back Saturday and do the install on the shower curbs, and 2nd floor vanities. 

Ray found a couple more things to add to the fireplace to take away from the stark top. They certainly do!

Things are moving along!




Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.