From $9.95



Syndication

Statistics

Users
Total: 30,972
Visited Last 30 days: 166
Forum Messages
Total: 20,753
Last 30 days: 5
Forum Evaluations
Total: 24,153
Last 30 days: 0
Journal Entries
Total: 5,273
Last 30 days: 7
Connections
Total: 15,158
Last 30 days: 8
Downloads
Total: 82,219

Journals

Name
The-Last-Rodeo Angel Fire, NM
23,596 Visits | 260 Posts | 409 Pix | 4 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
22 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
33 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
113,022 Visits | 943 Posts | 2,450 Pix | 42 Videos
Art-Camacho New Braunfels, TX
785 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
84 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
89 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,175 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
101 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
179 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
500 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
259 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
211 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
324 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
397 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,465 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,667 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
422 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
472 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
632 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


Hello to all... new to site, very impressed... The O-B Book was my best investment.
Paula in Melrose, Fl

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 2/13/2018

The master areas have had the wood floors installed and the second floor has two bedrooms and half the great room done as well.  We’ve installed all the shower fixtures and are slowly working on three of the four bathtubs.  The granite folks were supposed to put in the shower niche bottoms, set all of the shower curbs and the four vanity tops on the second floor.  Turned out to be a total mess yesterday when they showed up 4 hours late with less than half of the material.  Total disconnect within their organization.  Sandra called this morning and read them the riot act.  The owner was totally unaware of what had happened, but promised to review with his crews and correct.


We got together with the local welder on Friday to explain the supports we needed to hang the hollow log onto the fireplace.  He had them finished today and they were set in place.  Basically two large protruding J-hooks.  With these set, Ray can finish setting stone.  We are really hoping that this will wrap up this week so we clean up the area and get it ready for flooring.  Right now it has become a total mess.  

I replaced the cabinet fronts on the second floor set once that area of floor was in. Really a pretty easy job. Looking forward to getting the main level done, but not until all is clean and the floor is in. 

Photos

Fireplace with more stone on, and hollow log set.



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.