From $9.95



Syndication

Statistics

Users
Total: 32,910
Visited Last 30 days: 209
Forum Messages
Total: 20,966
Last 30 days: 7
Forum Evaluations
Total: 24,160
Last 30 days: 0
Journal Entries
Total: 5,400
Last 30 days: 8
Connections
Total: 15,247
Last 30 days: 4
Downloads
Total: 87,221

Journals

Name
NorthShoreBathrooms
11 Visits | 1 Posts | 2 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
599 Visits | 5 Posts | 4 Pix | 0 Videos
furnacerepairon St Catharines, AL
33 Visits | 1 Posts | 9 Pix | 0 Videos
furnacemkm Markham, AL
36 Visits | 1 Posts | 7 Pix | 0 Videos
vallejocleaningservi... Vallejo , CA
34 Visits | 1 Posts | 1 Pix | 0 Videos
getpestcontrol Delhi, AL
38 Visits | 1 Posts | 1 Pix | 0 Videos
noithattrieugia tphcm, AL
54 Visits | 1 Posts | 0 Pix | 0 Videos
httpownerbuilderbook...
120 Visits | 1 Posts | 0 Pix | 0 Videos
Packers-and-Movers Delhi, AL
380 Visits | 2 Posts | 1 Pix | 0 Videos
Best-Access-Doors Jackson, AL
170 Visits | 1 Posts | 0 Pix | 0 Videos
Concrete-Contractors...
232 Visits | 2 Posts | 0 Pix | 0 Videos
bird Springfield, MO
169 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
120,419 Visits | 1,004 Posts | 2,581 Pix | 47 Videos
Drywall-Repair-Lehi
247 Visits | 1 Posts | 0 Pix | 0 Videos
ianpundt
285 Visits | 1 Posts | 0 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
607 Visits | 2 Posts | 2 Pix | 0 Videos
httpswwwfaxitfastcom... salt lake city, AL
252 Visits | 1 Posts | 0 Pix | 0 Videos
Owning-My-First-Prop... Grand Rapids, MI
361 Visits | 1 Posts | 0 Pix | 0 Videos
movers-and-packers Hyderabad, AL
353 Visits | 1 Posts | 1 Pix | 0 Videos
Investment-Propertie... Rochester, MN
403 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

This is a great website and a great community.
Gene in Towaco, NJ

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 2/8/2018 2:07:19 PM

The fireplace is starting to emerge as a finished item after we got an inspection on Tuesday and Ray was able to begin wrapping the framing with lath. Stone was started yesterday and should take several days since the curved sides take time.  Ray also needs to get brackets made and set for the new hollow log that is going to be placed across the front, but the initial results of the stone look good.


Sandra and I have been laying out flooring on the second level for acclimation, and yesterday started fastening the master areas - BR, closet and bath.  We should finish that today.  

Started work on getting ready to set vent pipe for the second level fireplace.  Had to cut open the ceiling in a bedroom to have access to a joist bay to run it in. Not pleased to have to do it, and the venting should have been run before the sheetrock was put in, but was one of those things I put off.  So now will have to patch a 12’ strip and repaint once the venting arrives and is set and inspected.


Photos

Ray, the artist who is building the fireplace on the main level.
Horizontally placed hollow log that Ray found in the woods. Final location will be about a foot higher than it is shown here.
Stone started. The face above the fireplace will be straight, while the sides will be curved as shown here
Flooring in the second level laid upside down to acclimate for a few days before putting down. We’ve seen just a hair change is moisture level in the already very low numbers.



Login to Reply




Login to comment...
Copyright 1997-2020 Consensus Group Inc.