From $9.95



Syndication

Statistics

Users
Total: 31,419
Visited Last 30 days: 142
Forum Messages
Total: 20,821
Last 30 days: 20
Forum Evaluations
Total: 24,155
Last 30 days: 1
Journal Entries
Total: 5,316
Last 30 days: 7
Connections
Total: 15,187
Last 30 days: 8
Downloads
Total: 83,394

Journals

Name
duomit Rahway, NJ
9 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
114,701 Visits | 964 Posts | 2,503 Pix | 42 Videos
medicareinsurance
36 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
26 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
38 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,588 Visits | 34 Posts | 52 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
24,781 Visits | 269 Posts | 433 Pix | 4 Videos
Vintage-Oaks-Cabin New Braunfels, TX
428 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
178 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
902 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
220 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
243 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
255 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
278 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
283 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,050 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
329 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
297 Visits | 1 Posts | 0 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
334 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
412 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

What a great site this is!
Nancy from Ohio

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 2/4/2018 9:08:20 AM

By the end of the day yesterday, we finished laying the fourth floor.  A total of less than four full days to lay 1100 sq.ft.  Or about 20% of the total flooring.  And that was including the ever time consuming hundreds of trips up and down the stairs to get the flooring up to that level.  We’re talking 3500 lbs of flooring hauled up those steps a few boards at a time. Sandra is out of commission while her remaining real knee recoversfrom that workout.  The other two floors should still be work, but there is no changing levels once the flooring is lifted up to those levels with the Skytrak.  I’m going to lay the high density sound material in the master bedroom, bath and closet today and bring up flooring to acclimate.  Would really like to get the floor in before the granite guys come back with the shower curbs as the face sits on top of the floor.


Meanwhile Ray is slowly proceeding on the fireplace.  He found a hollow log in the forest that I need to help him get out today.  He thinks it’ll fit in wonderfully.  Until we see what he has planned, we’ll hold our thought.  Great artist, but he keeps everything so fluid, it feels like nothing will get finalized.  The electrical inspector couldn’t make it to reviewthe additions I made for lighting for the fireplace, but said he didn’t want to hold us up and to move forward. The mechanical inspector said he’ll be here Monday, tomorrow, and we shoild be good to go to start closing up the framing, if Ray can finalize his ideas so he can place proper bracing and attachments.


Photos

Floorings pics from the top of the stairs



Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.