From $9.95



Syndication

Statistics

Users
Total: 32,620
Visited Last 30 days: 158
Forum Messages
Total: 20,955
Last 30 days: 37
Forum Evaluations
Total: 24,160
Last 30 days: 0
Journal Entries
Total: 5,387
Last 30 days: 5
Connections
Total: 15,243
Last 30 days: 2
Downloads
Total: 86,799

Journals

Name
httpownerbuilderbook...
9 Visits | 1 Posts | 0 Pix | 0 Videos
Packers-and-Movers Delhi, AL
251 Visits | 2 Posts | 1 Pix | 0 Videos
Best-Access-Doors Jackson, AL
52 Visits | 1 Posts | 0 Pix | 0 Videos
Concrete-Contractors...
111 Visits | 2 Posts | 0 Pix | 0 Videos
bird Springfield, MO
67 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
119,667 Visits | 1,004 Posts | 2,581 Pix | 47 Videos
Drywall-Repair-Lehi
134 Visits | 1 Posts | 0 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
458 Visits | 2 Posts | 2 Pix | 0 Videos
ianpundt
155 Visits | 1 Posts | 0 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
480 Visits | 2 Posts | 2 Pix | 0 Videos
httpswwwfaxitfastcom... salt lake city, AL
142 Visits | 1 Posts | 0 Pix | 0 Videos
Owning-My-First-Prop... Grand Rapids, MI
243 Visits | 1 Posts | 0 Pix | 0 Videos
movers-and-packers Hyderabad, AL
230 Visits | 1 Posts | 1 Pix | 0 Videos
Investment-Propertie... Rochester, MN
279 Visits | 1 Posts | 0 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
26,962 Visits | 271 Posts | 435 Pix | 4 Videos
E2custom
873 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
836 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
50,283 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
883 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
834 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

This has been a great resource for us. Thank you!
Mike in Blacksburg, VA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 2/4/2018 9:08:20 AM

By the end of the day yesterday, we finished laying the fourth floor.  A total of less than four full days to lay 1100 sq.ft.  Or about 20% of the total flooring.  And that was including the ever time consuming hundreds of trips up and down the stairs to get the flooring up to that level.  We’re talking 3500 lbs of flooring hauled up those steps a few boards at a time. Sandra is out of commission while her remaining real knee recoversfrom that workout.  The other two floors should still be work, but there is no changing levels once the flooring is lifted up to those levels with the Skytrak.  I’m going to lay the high density sound material in the master bedroom, bath and closet today and bring up flooring to acclimate.  Would really like to get the floor in before the granite guys come back with the shower curbs as the face sits on top of the floor.


Meanwhile Ray is slowly proceeding on the fireplace.  He found a hollow log in the forest that I need to help him get out today.  He thinks it’ll fit in wonderfully.  Until we see what he has planned, we’ll hold our thought.  Great artist, but he keeps everything so fluid, it feels like nothing will get finalized.  The electrical inspector couldn’t make it to reviewthe additions I made for lighting for the fireplace, but said he didn’t want to hold us up and to move forward. The mechanical inspector said he’ll be here Monday, tomorrow, and we shoild be good to go to start closing up the framing, if Ray can finalize his ideas so he can place proper bracing and attachments.


Photos

Floorings pics from the top of the stairs



Login to Reply




Login to comment...
Copyright 1997-2020 Consensus Group Inc.