From $9.95



Syndication

Statistics

Users
Total: 30,482
Visited Last 30 days: 156
Forum Messages
Total: 20,714
Last 30 days: 5
Forum Evaluations
Total: 24,148
Last 30 days: 0
Journal Entries
Total: 5,222
Last 30 days: 17
Connections
Total: 15,137
Last 30 days: 2
Downloads
Total: 80,846

Journals

Name
The-Last-Rodeo Angel Fire, NM
22,445 Visits | 237 Posts | 358 Pix | 4 Videos
MesaBarnHouse Mesa, AZ
887 Visits | 32 Posts | 46 Pix | 0 Videos
Stan-Tol Winter Springs, FL
46 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
264 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
107 Visits | 1 Posts | 1 Pix | 0 Videos
Tanglewood Colorado Springs, CO
111,787 Visits | 925 Posts | 2,426 Pix | 42 Videos
benson-bondstone-hom... Coeur d'Alene, AL
67 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
185 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
246 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,057 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,243 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
309 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
337 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
458 Visits | 1 Posts | 0 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
1,022 Visits | 3 Posts | 1 Pix | 0 Videos
Our-log-home Thomaston, GA
940 Visits | 2 Posts | 4 Pix | 0 Videos
697-Marlin Austin/McDade, TX
6,314 Visits | 63 Posts | 508 Pix | 0 Videos
skiddinginbroadside Livermore, AL
863 Visits | 1 Posts | 0 Pix | 0 Videos
thedaniels Graham, WA
924 Visits | 5 Posts | 5 Pix | 0 Videos
Cabin-Addition--Spra... Austin, TX
840 Visits | 1 Posts | 5 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

Just recently bumped into your site. I love it!
Mary in WA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 2/1/2018 9:19:55 AM

And flooring started!  All the accent walls we had planned, are up with the exception of trim.  Based on the first bedroom, and the reaction of the trim as it dries, and the fact that wood floor needs to be installed  before final length can be determined, we’ll wait until the floors are in.


So yesterday we started installing the floor on the fourth floor.  Getting started up there is a bit of a process with the number of rooms that are involved and rooms mean doorways and walls to contend with.  And we ran through all of the material we had staged up there. Need to bring more up, and if the moisture content is ok, we’ll continue to lay more, if not, we’ll hold off.  I’ve got plenty of other things I can work on, it’s just so nice to see the floor going in!

Photos

Upstairs, we’re using 6,7 & 8” wide planks, one would think wide planks would speed things along, but the long lengths(up to 12’) and width, actually makes it more difficult to get tongues and grooves to match up. The green material is a high density foam product that is supposed to dampen noise to below



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.