The work on the main fireplace has slowed down. I ordered the vent kit, which should be here Monday, and I have to run electrical to both the unit and to any places we want lighting. And then both of those have to be inspected. So Ray can work on the tree trunks and get them fully cleaned and finished and can finish building the hearth while the other stuff happens. I’m framing out the lower fireplace and running the gas to it.
We ended up going to Pueblo, CO on Thursday as they had stone in stock that we liked. While there we also found stone for the lower FP, but we’ll need to order that and retiurn to get it.
Tile guys finished showers on the 4th and third floors. They’ll move to the second floor next week to begin the last three showers. Granite guys will come up after all of the showers are done to template the curbs and niches. I’ll bring some flooring up to the 4th floor to begin acclimating.
A bit of the replacement cabinetry arrived yesterday. More to follow. And Sandra is making great strides with the rough-sawn boards, sanding and applying the chemicals. As they are pine, they react far more quickly than the aspen, and we should be able to start putting them up before too long. Just want them to dry out some more before we do so.
Login to Reply