From $9.95



Syndication

Statistics

Users
Total: 31,141
Visited Last 30 days: 146
Forum Messages
Total: 20,771
Last 30 days: 14
Forum Evaluations
Total: 24,154
Last 30 days: 1
Journal Entries
Total: 5,293
Last 30 days: 9
Connections
Total: 15,165
Last 30 days: 6
Downloads
Total: 82,463

Journals

Name
Z-Oen Dayton, OH
0 Visits | 1 Posts | 0 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
24,028 Visits | 265 Posts | 422 Pix | 4 Videos
Tanglewood Colorado Springs, CO
113,591 Visits | 951 Posts | 2,473 Pix | 42 Videos
washougalhome Washougal, WA
665 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
59 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
48 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
64 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
102 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
129 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
861 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
167 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
147 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,309 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
165 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
245 Visits | 1 Posts | 0 Pix | 0 Videos
Metal-Buildings Conroe, TX
346 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
314 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
397 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
493 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,620 Visits | 40 Posts | 177 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
James in Beaumont, TX0.002
Timmy Weeks0.001
Steve0.002

I think part of what makes this a valuable resource is the lack of spam, trolls, and advertising. There are some good, reliable discussions and content on that board, and not much wasted space.
Kenneth in Lees Summit, MO

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 10/7/2017

The stone guy, who also does tile, staining, painting, carpentry etc etc, put in as much of the kitchen ceiling (t&g Aspen) as he can for the moment.  We have to set the bath tubs before he can do anymore because we need access below the tubs to connect the drains.  Tubs can’t get set until the wood floors go in underneath them.  That will be a while as we are just getting ready to order the flooring, all 6000 ft of it.  Trying to get the cabinets ordered as well to get them delivered before the snow gets so bad we can’t get them up the drive.  We are running against the clock now.


Meantime, the mechanical guy hasn’t come back as he promised.  Need to get him out.  The propane tank been delivered, buried and connected to the house.  Another call to him tomorrow.

Rained tremendously while we were  out of town so landscaping has not gone anywhere. Finally drying out and should be good this coming week for him to get moving.

Sandra’s finishing the last of the painting and cleaning floor by floor.  Between the spray paint dust and the sawdust from the kitchen ceiling installation, it was pretty dirty.  But she’s doing the windows too, getting them all spruced up after painting.  Starting to look like a home in some ways!

I’ve been trying to clean up ouside before snow comes.  Got rid of the OSB we used for temporary decking.  The sheetrock hangers never took it, so the stone guy took a bunch, and I took the rest to the dump.  Guy there ended up taking it.  That’s great as even though it was pretty waterlogged, it’ll be ok for simple stuff once it dries.  Got the cinders for the drive transferred from a rusty barrel to a 90 gal plastic garbage bin so it’ll be ready for winter.  The rest of the roofing scraps, stone scraps all gone.  Just need to lift a couple of pallets of stone up to the third floor for the fireplace and the outside will be pretty cleaned up.

Today I started on making the deck railing sections.  The first one took quite a while as I tried to figure out a look.  But from then on, it’s not a difficult job.  Just will take a long time as there are nearly 1500 holes to drill for the balusters.  There are about 60 sections to make.  Oh well, just something that will get done.

Friday the installers came with the car lift!  But- they lost some anchors on the drive up and while they got it up, they didn’t finish.  Will be back sometime this coming week to finish, but it looks great! Can’t wait to get to use it.  

All of the ventilation ducts and water heater vents are finished in the attic. The blow in insulation will go in Tuesday so the house is getting buttoned up. Still need to get seals around the garage doors, but it’s coming along.  If we can just get the mechanical guy to finish the furnaces, we’ll shortly be ready for winter.



Photos

T&G aspen in the kitch ceiling
First section of deck railing. Needs to be stained, but ready to install afterwards.
With this, the first floor is finished lol!



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.