From $9.95



Syndication

Statistics

Users
Total: 33,060
Visited Last 30 days: 158
Forum Messages
Total: 20,988
Last 30 days: 19
Forum Evaluations
Total: 24,160
Last 30 days: 0
Journal Entries
Total: 5,418
Last 30 days: 16
Connections
Total: 15,255
Last 30 days: 4
Downloads
Total: 87,432

Journals

Name
Rick-Low
11 Visits | 5 Posts | 0 Pix | 0 Videos
pressure-washing-ren...
15 Visits | 1 Posts | 0 Pix | 0 Videos
getpestcontrol Delhi, AL
111 Visits | 4 Posts | 1 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
681 Visits | 9 Posts | 5 Pix | 0 Videos
Dream-Home Biloxi, MS
31 Visits | 1 Posts | 0 Pix | 0 Videos
Linksys-Extender-Set...
27 Visits | 1 Posts | 0 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
68,360 Visits | 177 Posts | 525 Pix | 4 Videos
1860s-Texas-rehabnew... Boerne, TX
50,536 Visits | 45 Posts | 194 Pix | 0 Videos
Forex-Trading-For-Be...
300 Visits | 3 Posts | 0 Pix | 0 Videos
NorthShoreBathrooms
90 Visits | 1 Posts | 2 Pix | 0 Videos
furnacerepairon St Catharines, AL
96 Visits | 1 Posts | 9 Pix | 0 Videos
furnacemkm Markham, AL
96 Visits | 1 Posts | 7 Pix | 0 Videos
noithattrieugia tphcm, AL
116 Visits | 1 Posts | 0 Pix | 0 Videos
httpownerbuilderbook...
185 Visits | 1 Posts | 0 Pix | 0 Videos
Packers-and-Movers Delhi, AL
470 Visits | 2 Posts | 1 Pix | 0 Videos
Best-Access-Doors Jackson, AL
234 Visits | 1 Posts | 0 Pix | 0 Videos
bird Springfield, MO
229 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
120,942 Visits | 1,004 Posts | 2,581 Pix | 47 Videos
Drywall-Repair-Lehi
309 Visits | 1 Posts | 0 Pix | 0 Videos
ianpundt
353 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

I love this site, I never dreamed something like this existed.
Willie in Rich Creek, VA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Amanda in Mesa, AZ's Journal Entries


Click here to create your own construction journal.

Posted by Amanda in Mesa, AZ on 8/16/2017 11:58:08 AM

Stem walls have been inspected, poured, and they started taking the wood frame down. Plumbing has not started, but we are planning on it to start and be complete this week. The appraisal came back and it was where we needed it to be. The insurance company was a nightmare trying to get the correct documentation for the bank, but I think we are good now and should be closing our loan within the next week. Things feel like they are going slow, but I guess that is ok because we don't have the loan finalized, but hopefully in the next few weeks the loan will be done and we can really start moving.


Login to Reply




Login to comment...
Copyright 1997-2020 Consensus Group Inc.