From $9.95



Syndication

Statistics

Users
Total: 32,910
Visited Last 30 days: 209
Forum Messages
Total: 20,966
Last 30 days: 7
Forum Evaluations
Total: 24,160
Last 30 days: 0
Journal Entries
Total: 5,400
Last 30 days: 8
Connections
Total: 15,247
Last 30 days: 4
Downloads
Total: 87,221

Journals

Name
NorthShoreBathrooms
11 Visits | 1 Posts | 2 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
599 Visits | 5 Posts | 4 Pix | 0 Videos
furnacerepairon St Catharines, AL
33 Visits | 1 Posts | 9 Pix | 0 Videos
furnacemkm Markham, AL
36 Visits | 1 Posts | 7 Pix | 0 Videos
vallejocleaningservi... Vallejo , CA
34 Visits | 1 Posts | 1 Pix | 0 Videos
getpestcontrol Delhi, AL
38 Visits | 1 Posts | 1 Pix | 0 Videos
noithattrieugia tphcm, AL
54 Visits | 1 Posts | 0 Pix | 0 Videos
httpownerbuilderbook...
120 Visits | 1 Posts | 0 Pix | 0 Videos
Packers-and-Movers Delhi, AL
380 Visits | 2 Posts | 1 Pix | 0 Videos
Best-Access-Doors Jackson, AL
170 Visits | 1 Posts | 0 Pix | 0 Videos
Concrete-Contractors...
232 Visits | 2 Posts | 0 Pix | 0 Videos
bird Springfield, MO
169 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
120,419 Visits | 1,004 Posts | 2,581 Pix | 47 Videos
Drywall-Repair-Lehi
247 Visits | 1 Posts | 0 Pix | 0 Videos
ianpundt
285 Visits | 1 Posts | 0 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
607 Visits | 2 Posts | 2 Pix | 0 Videos
httpswwwfaxitfastcom... salt lake city, AL
252 Visits | 1 Posts | 0 Pix | 0 Videos
Owning-My-First-Prop... Grand Rapids, MI
361 Visits | 1 Posts | 0 Pix | 0 Videos
movers-and-packers Hyderabad, AL
353 Visits | 1 Posts | 1 Pix | 0 Videos
Investment-Propertie... Rochester, MN
403 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

Great site. It WILL help me build my house!!
Bob Potter

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 7/15/2017 12:48:06 PM

Got the final two inspections that were necessary before the drywall goes in - framing and mechanical.  Drywall comes Monday and they need to haul 64 sheets from the third to the fourth floor before they begin.  Meanwhile, the mechanical guys need to finish cutting in a return air grill the goes through a wall on the fourth floor.  So we'll play a little dance between them and the drywall crew. 


As the roof isn't fully dry as we wait on the roofer, we'll stagger where the drywall gets put up, probably moving from one floor to another and back again.  The job is large enough that we should be able to keep the crew occupied the whole time and hopefully the roofer can get everything in the dry by the end of the week.  Trouble is there is rain in the forecast for every day next week.  But normally we can get through about 3 o'clock before it moves in.

I'm still working on things that need to be finished as well, creating a new punch list and working through it.  Sandra's been insulating interior walls for abatement.  We ordered  three pallets of rock wool insulation for soundproofing the ceiling of the second floor, but after two weeks, HD still hadn't shipped it.  So I cancelled the order and we'll head to Albuquerque Sunday to pick it up. That's another thing that has to be installed before sheetrock. But again it'll be a dance with the rockers.

I can't wait to see the drywall go on.  It totally changes the look of everything and it now finally begins to look like a home inside.


Login to Reply




Login to comment...
Copyright 1997-2020 Consensus Group Inc.