From $9.95



Syndication

Statistics

Users
Total: 31,925
Visited Last 30 days: 136
Forum Messages
Total: 20,869
Last 30 days: 3
Forum Evaluations
Total: 24,158
Last 30 days: 0
Journal Entries
Total: 5,332
Last 30 days: 0
Connections
Total: 15,216
Last 30 days: 2
Downloads
Total: 85,042

Journals

Name
The-Last-Rodeo Angel Fire, NM
25,774 Visits | 271 Posts | 435 Pix | 4 Videos
Tanglewood Colorado Springs, CO
116,713 Visits | 971 Posts | 2,515 Pix | 42 Videos
E2custom
259 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
306 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
49,617 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
356 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
319 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
346 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
2,038 Visits | 34 Posts | 52 Pix | 0 Videos
Vintage-Oaks-Cabin New Braunfels, TX
725 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
488 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
1,271 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
531 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
552 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
561 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
562 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
591 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,334 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
630 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
542 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Sally0.001

Thanks for rectifying my order. It’s a pleasure working with a company with integrity!
Ken Moore

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 7/13/2017 8:40:41 AM

I'm getting peeved at the roofers as this thing drags out.  They worked three days the first week, didn't work the second week as they were supposed to finish the job in Artesia after the holiday, but didn't. Left yesterday afternoon for Artesia after 2 1/2 days here. And while they are here, the first sprinkles of rain and they quit for the day.  Like yesterday, ten drops of rain, they quit and it didn't start raining for real until evening.  Arggggh! The one one thing that did happen this week was the long panels got curved yesterday. Finally!  So if they can get them up early next week, the excavator can begin work on fixing the issue with the pump tank and put in the septic.  Sheetrock is to begin next week, and we are going to have to work around the roofers lack of finishing, putting in rock where he has finished (4th floor) and areas of other floors directly below.  It'll take a while for the rock so hopefully the roofer can catch up.


Meanwhile, the heating ducts are still going in.  The guys are doing a good job, especially as it is all a tight fit in the floor trusses, especially considering the framer had reversed many of them.  Same issue I had with plumbing, except the ducts are a whole lot larger.  Fortunately, slope is not an issue like it is with plumbing.

I'm having to get involved in the duct work to some extent, cutting the couple of trusses where they needed to be, and making the stands for the furnaces.  Been running the bath vent lines where they will soon be covered by drywall, which has required reopening holes that I tried to create last year in the concrete wall when they poured, but got crushed from the weight of the concrete.  Nothing is easy on this job.

Got hold of the fellow who will sprayfoam the garage ceiling.  I told him a couple weeks ago I'd be ready, but he never ordered the material.  Glad I got hold of him again yesterday.  I hope that doesn't slow us down.  And I ordered three pallets of rock wool soundproofing from Home Depot two weeks ago.  It still hasn't shipped.  I need that in order to drywall the second floor.  All of these issues with subs and suppliers not holding to their timeline is driving me absolutely crazy.  I know I could not be a GC for a living.

Photos

curving the roof panels using a forming machine
Finished panels ready for installation and I'm ready to get them off the freaking ground!



Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.