Tested the next two levels this morning. Found one more leak, and again it was an unglued joint. And again, it will be easy to fix, thank goodness. Just needed to let it dry out, before gluing. Went through the entire house, double-checking nail plates and stapling for the electrical. Now that we again have access to the 4th floor, I called this afternoon for the full rough-in inspection.
Will get back to the water lines tomorrow. Quite a bit of things to do to there. While all the lines are in place, they need to be fastened down and capped. The pressure reducing valves need to be set in place as well. Once all of the that is done, I can go ahead and get water pressured up and test them. As it is PEX tubing, and I'm using an expansion type of connectors, leaks are generally very rare, so testing should be simple. Hopefully wrap this part up by the end of the weekend if not sooner. Then call for plumbing inspection. Can there be a light at the end of the tunnel?!
The stone guys worked on the pillars and got them finished. Stucco guys are waiting for better weather. Its been raining again, these days at the house instead of just around us. Weird Spring.
Photos
|
Stone guys working on the pillars |
|
Login to Reply