From $9.95



Syndication

Statistics

Users
Total: 31,611
Visited Last 30 days: 119
Forum Messages
Total: 20,842
Last 30 days: 12
Forum Evaluations
Total: 24,156
Last 30 days: 0
Journal Entries
Total: 5,329
Last 30 days: 4
Connections
Total: 15,197
Last 30 days: 7
Downloads
Total: 83,804

Journals

Name
Tanglewood Colorado Springs, CO
115,364 Visits | 971 Posts | 2,515 Pix | 42 Videos
E2custom
80 Visits | 4 Posts | 10 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
25,135 Visits | 270 Posts | 433 Pix | 4 Videos
draingrepairsnj
104 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
49,265 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
155 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
130 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
149 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,734 Visits | 34 Posts | 52 Pix | 0 Videos
Vintage-Oaks-Cabin New Braunfels, TX
532 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
288 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
1,030 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
337 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
357 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
365 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
385 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
383 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,150 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
430 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
356 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Sally0.001

Hello, I am new and have been planning and researching the house I will build for eight months now. I am thrilled to find this site.
Dave B.

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 6/5/2017

The framers finished the last part of the stairs today.  We still have railings to install once we figure how we want to do them, but they are fully functional to the 4th floor.  Over the weekend I  worked on finishing running PEX water lines.  They are all in for each fixture, but I still need to fasten them and create the stub outs.  And I need to set the PRVs at the second and third level to drop the pressure.  I spent the day Friday installing the last of the outdoor freeze-proof spigots.  These were tricky as they were in the living section walls and not the garage. I had to get the length correct so that I could bury the water line within the foam, using soldered copper fittings.  Tight, but all 5 went well without any leaks.


Speaking of leaks, after a day of prepping shower and bath drain stubouts throughout the house, and finishing the vent connections in the attics, I finally did a test of one floor's drains.  All went well with the exception of one side of one fitting where I had forgotten to glue the joint. So after emptying the water into a 32 gallon trash can, I repaired it and will go on to test the other two floors. And oh by the way, the volume of 90 feet of 4" line is way over 32 gallons.  Ask me how I know.  At least the garage floor is much cleaner now.

Photos

Just a slope side shot of the house from an angle I hadn't taken from before. Stone and brown coat are on. Waiting for the color coat.
A shot of the stairs. No real good way to shoot and capture the true essence of the height and massiveness.



Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.