From $9.95



Syndication

Statistics

Users
Total: 30,813
Visited Last 30 days: 164
Forum Messages
Total: 20,746
Last 30 days: 5
Forum Evaluations
Total: 24,153
Last 30 days: 4
Journal Entries
Total: 5,263
Last 30 days: 10
Connections
Total: 15,149
Last 30 days: 4
Downloads
Total: 81,668

Journals

Name
The-Last-Rodeo Angel Fire, NM
23,194 Visits | 252 Posts | 384 Pix | 4 Videos
Car-Rentals-in-Udaip... Delhi, AL
0 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
112,576 Visits | 942 Posts | 2,450 Pix | 42 Videos
Art-Camacho New Braunfels, TX
749 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
56 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
55 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,097 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
72 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
139 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
439 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
213 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
168 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
284 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
353 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,289 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,554 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
393 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
425 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
579 Visits | 1 Posts | 0 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
1,226 Visits | 3 Posts | 1 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


I have gotten more insight, courage to O-B and future savings from this website than I can say. And it's all free!
Guy in San Luis Obispo

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 5/18/2017 8:36:56 AM

After weeks of alternating terrible and great weather, and broken promises on the stucco contractor, they finally returned Wednesday to begin applying the scratch coat.  Really changes the look - for the better!  After a year of seeing raw ICF blocks and roughed in windows, I can see better what the end result will be, and it's good.  The stone guys are moving along very fast having finished the back of the house with only the cap to put in. I ordered another 600 sq. ft. of stone to be able to finish off the outside of the stairwell.  Luckily they had it in stock in Peublo, CO, so the local yard will be able to get it to us by Wednesday. So all of the flatwork coild be done by the end of next week or shortly after.  Still have the pillars to do, but waiting to see how many corners I'll have left when we get to that point. Will most likey need to order more.


The framers have finally figured out how the stairs could be built and started them on Tuesday.  Slow going, will get harder as they get higher up as the 8x8 posts are monsters to get in and set up.  Ground level was one thing, but the next three?  Massive with the steps made of 4x12's.  The pictures attached here don't convey the size of the components.

The local propane company came out and ran all of the interior gas lines the past couple days.  A lot of connections - two stoves, two furnaces, two water heaters, three fireplaces, two radiant space heaters and one grill.  They'll come back later and set the tank and run the line to house.

Oh! I had the plumbing inspector out last Friday to review what I had done so far on running the lines.  Other than adding a couple of cleanouts, everything was fine.  I've slacked off on the plumbing the past several days with all the other activity needing my attention in varoius ways, but now that the gas guys are out of the house. I'll try to get back and work on it again so I can begin water testing soon.

Well - its 6:30 am when I am writing this.  I just opened the blinds and see that we have a major snow storm happening. I guess that cancels all outside activities for today :-(

Photos

setting up the first floor 8x8 posts
Posts set and braced
First landings
Cutting the stringers
Attaching the steps with 9" timber screws
After two days work, we're here. Slow going, but should speed up now that the basic understanding is set.
Back of the house gettin stoned.
Front of the house getting stucco scratch coat
Why it's called a scratch coat. Surface is very rough to create better adhesion for the next coat.



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.