From $9.95



Syndication

Statistics

Users
Total: 32,620
Visited Last 30 days: 158
Forum Messages
Total: 20,955
Last 30 days: 37
Forum Evaluations
Total: 24,160
Last 30 days: 0
Journal Entries
Total: 5,387
Last 30 days: 5
Connections
Total: 15,243
Last 30 days: 2
Downloads
Total: 86,799

Journals

Name
httpownerbuilderbook...
8 Visits | 1 Posts | 0 Pix | 0 Videos
Packers-and-Movers Delhi, AL
250 Visits | 2 Posts | 1 Pix | 0 Videos
Best-Access-Doors Jackson, AL
51 Visits | 1 Posts | 0 Pix | 0 Videos
Concrete-Contractors...
110 Visits | 2 Posts | 0 Pix | 0 Videos
bird Springfield, MO
66 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
119,665 Visits | 1,004 Posts | 2,581 Pix | 47 Videos
Drywall-Repair-Lehi
133 Visits | 1 Posts | 0 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
457 Visits | 2 Posts | 2 Pix | 0 Videos
ianpundt
154 Visits | 1 Posts | 0 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
479 Visits | 2 Posts | 2 Pix | 0 Videos
httpswwwfaxitfastcom... salt lake city, AL
141 Visits | 1 Posts | 0 Pix | 0 Videos
Owning-My-First-Prop... Grand Rapids, MI
241 Visits | 1 Posts | 0 Pix | 0 Videos
movers-and-packers Hyderabad, AL
229 Visits | 1 Posts | 1 Pix | 0 Videos
Investment-Propertie... Rochester, MN
277 Visits | 1 Posts | 0 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
26,960 Visits | 271 Posts | 435 Pix | 4 Videos
E2custom
872 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
835 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
50,282 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
882 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
833 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

The OwnerBuilderBook.com website is one of my favorite resources.
Jerome from Durham, NC

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 3/9/2017

So the wood for the stairs comes next week, but after a discussion with Sandra, whose idea is to get the stairwell sheetrocked first, we decided to do just that.  Also changed is we're ditching the sconces and will go with chandeliers.  Now to figure out how to hang them and more importantly, how to place wiring before the drywall.


In the meantime, I've ordered the elevator which will take about 2 months to get.  Ran a 240V and a 120V over to the location.  Finished the last wall for the shaft, finally and fireblocked the last level.  I drilled holes the the concrete walls for 50amp lones for hot tubs and ran the cable.  Meanwhile Sandra finished stripping wiring, and has moved on to placing blocking for towel racks and paper holders in the bathrooms.  Also will set blocking for shelving and TV brackets.  
Another garage door got new springs this week and I got an opener working on it.  Now the double door and it should get working next week if the springs work for it.  We're still looking at two different sets sent by the manufacturer. We havent ordered ones through the local guy - yet. Fingers crossed.

Got two companies out this week to look at the stucco and drywall.  Just contacted another one today and they'll be out next week.  Should have some numbers to choose from in a couple weeks.  Weather is definitely changing and we want to move on it as soon as possible.  

Will get back on plumbing now that I took a break, taking care of lingering electrical and framing.  


Login to Reply




Login to comment...
Copyright 1997-2020 Consensus Group Inc.