From $9.95



Syndication

Statistics

Users
Total: 31,628
Visited Last 30 days: 127
Forum Messages
Total: 20,842
Last 30 days: 11
Forum Evaluations
Total: 24,157
Last 30 days: 1
Journal Entries
Total: 5,329
Last 30 days: 3
Connections
Total: 15,197
Last 30 days: 7
Downloads
Total: 83,823

Journals

Name
Tanglewood Colorado Springs, CO
115,417 Visits | 971 Posts | 2,515 Pix | 42 Videos
E2custom
89 Visits | 4 Posts | 10 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
25,165 Visits | 270 Posts | 433 Pix | 4 Videos
draingrepairsnj
110 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
49,273 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
161 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
136 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
158 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,742 Visits | 34 Posts | 52 Pix | 0 Videos
Vintage-Oaks-Cabin New Braunfels, TX
537 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
298 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
1,038 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
344 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
364 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
372 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
390 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
388 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,155 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
437 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
363 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Sally0.001

Thanks again and it has been a pleasure reading all
the posts on the site.
Brad Herbst

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 3/9/2017

So the wood for the stairs comes next week, but after a discussion with Sandra, whose idea is to get the stairwell sheetrocked first, we decided to do just that.  Also changed is we're ditching the sconces and will go with chandeliers.  Now to figure out how to hang them and more importantly, how to place wiring before the drywall.


In the meantime, I've ordered the elevator which will take about 2 months to get.  Ran a 240V and a 120V over to the location.  Finished the last wall for the shaft, finally and fireblocked the last level.  I drilled holes the the concrete walls for 50amp lones for hot tubs and ran the cable.  Meanwhile Sandra finished stripping wiring, and has moved on to placing blocking for towel racks and paper holders in the bathrooms.  Also will set blocking for shelving and TV brackets.  
Another garage door got new springs this week and I got an opener working on it.  Now the double door and it should get working next week if the springs work for it.  We're still looking at two different sets sent by the manufacturer. We havent ordered ones through the local guy - yet. Fingers crossed.

Got two companies out this week to look at the stucco and drywall.  Just contacted another one today and they'll be out next week.  Should have some numbers to choose from in a couple weeks.  Weather is definitely changing and we want to move on it as soon as possible.  

Will get back on plumbing now that I took a break, taking care of lingering electrical and framing.  


Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.