While I am slowly making progress, very slowly, on the plumbing, one can see that the weather is turning and Spring is not far away. I've contacted four stucco contractors this last week and three appear interested in looking at the job. Good as they are all about 2 hours away. The local fellow I contacted replied initially, but has not at all since then. He was the same fellow I tried to get a reply on the ICF concrete work last year. I won't ever bother with him again. Hoping to meet with at least two of the guys this coming week. Stucco needs to get done before the metal roof goes on, which in hindsight was a good thing the roofer didn't finish last year. While we got almost 2 feet of snow early this week, there is nothing in the forecast and temps are in the 50s and 60s coming up. Snow will be disappearing fast, and the stucco should be able to be knocked out. Also starting to look for drywall quotes even though I won't be ready for that for quite a while.
Wood for the staircase will arrive on the 14th and the framer should start on those. Meanwhile, I'll continue moving at a turtle's pace on the plumbing.
Photos
|
Way up there is some of the sewer lines |
|
|
Looks like the other photo but is the first, harder bathroom. |
|
Login to Reply