Ok, I needed another roll of 12 and 14 ga. I think that brings me to about 6000'. But that should about do it? Yeah, I know I said that before. We took the last week off as family came to visit. A lot of family. It was a good respite from the work and the snow stayed pretty good so eveyome had a great time on the slopes. But yesterday, I got back to the electric, which is finally in the finishing stages, setting all of the multi-ganged switch boxes into the ICFs at the entryways, running lines for the outdoor lights, and tomorrow, the exterior receptacles near the garage doors. I need to set the outdoor boxes using diamond drills for the round, and a masonary blade on a 4" grinder for the receptacles. Sandra will strip the outer sheath and tie grounds together over the next several days at least. The framer said he is getting ready to begin the massive staircase that goes into the bumpout. Once that is done, I need to run one last set of electric. A big one-eight sconces that illuminate the stairs. I'll be setting the system so you can access the sconces to each floor level from any level. This'll mean a 4-gang box at each level, using 3 and 4 way switches. And a lot of wire, maybe one more 250' roll of 14-2.
But before that happens, the stairs need to be built, so while that happens, I'll finish insulating the shed roof that I discussed last time, now that I restocked on materials. And then - finally plumbing! Yes I'm late. But some things did get in the way besides the enormousness of it all.
Login to Reply