From $9.95



Syndication

Statistics

Users
Total: 31,144
Visited Last 30 days: 144
Forum Messages
Total: 20,771
Last 30 days: 12
Forum Evaluations
Total: 24,154
Last 30 days: 1
Journal Entries
Total: 5,294
Last 30 days: 9
Connections
Total: 15,167
Last 30 days: 4
Downloads
Total: 82,471

Journals

Name
The-Last-Rodeo Angel Fire, NM
24,052 Visits | 266 Posts | 426 Pix | 4 Videos
Z-Oen Dayton, OH
4 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
113,653 Visits | 951 Posts | 2,473 Pix | 42 Videos
washougalhome Washougal, WA
671 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
63 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
53 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
68 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
107 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
133 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
867 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
172 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
152 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,316 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
168 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
253 Visits | 1 Posts | 0 Pix | 0 Videos
Metal-Buildings Conroe, TX
352 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
319 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
404 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
499 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,631 Visits | 40 Posts | 177 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
James in Beaumont, TX0.002
Timmy Weeks0.001
Steve0.002

I love the book and love the website, particularly the Forums.
Kurt B., Cecil, PA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Craig in Graham, WA's Journal Entries


Click here to create your own construction journal.

Posted by Craig in Graham, WA on 2/12/2017

Well, we are making some progress...First of all we received just more the 18" of snow last Sunday, Feb 5th.  Not very common for Western Washington to get 6" of snow let alone 18". Schools were closed for 3 days, I couldn't get to work for 2 days and nothing got done on my project. By Friday, Feb 10 all the snow was just about gone and the surveyor's had been here and did there thing. Talking with the engineer he says I should have my road detail and cross sections finish by Wednesday this week. If that happens, a quick submittal to Pierce County Planning and my permit should be in hand.

I have the excavator setup for Feb. 21st, he is saying about 2 to 3 days to dig and prepare for the foundation. My foundation guy  can't start until March 10th. But I have lots to do. Including moving a water line from my well, septic pump electrical has to be moved, along with the cable/telephone lines plus moving an exterior electrical line to my heat pump and another for my emergency generator panel.  I think I will mount new the new 200 Amp panel and my new 320 Amp meter base, get the conduits installed and wire pulled to both panels. The framer is all set, I have him set up to start on March 20th. We shall see if this all comes together. 

Craig



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.