From $9.95



Syndication

Statistics

Users
Total: 32,447
Visited Last 30 days: 157
Forum Messages
Total: 20,913
Last 30 days: 12
Forum Evaluations
Total: 24,160
Last 30 days: 2
Journal Entries
Total: 5,379
Last 30 days: 6
Connections
Total: 15,241
Last 30 days: 6
Downloads
Total: 86,514

Journals

Name
Drywall-Repair-Lehi
29 Visits | 1 Posts | 0 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
352 Visits | 2 Posts | 2 Pix | 0 Videos
Tanglewood Colorado Springs, CO
119,114 Visits | 1,003 Posts | 2,579 Pix | 47 Videos
ianpundt
42 Visits | 1 Posts | 0 Pix | 0 Videos
Magic-Of-The-SideSto... San Carlos, CA
357 Visits | 2 Posts | 2 Pix | 0 Videos
httpswwwfaxitfastcom... salt lake city, AL
48 Visits | 1 Posts | 0 Pix | 0 Videos
Owning-My-First-Prop... Grand Rapids, MI
126 Visits | 1 Posts | 0 Pix | 0 Videos
movers-and-packers Hyderabad, AL
129 Visits | 1 Posts | 1 Pix | 0 Videos
Packers-and-Movers Delhi, AL
138 Visits | 1 Posts | 0 Pix | 0 Videos
Investment-Propertie... Rochester, MN
167 Visits | 1 Posts | 0 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
26,720 Visits | 271 Posts | 435 Pix | 4 Videos
E2custom
762 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
728 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
50,144 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
765 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
725 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
767 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
2,551 Visits | 34 Posts | 52 Pix | 0 Videos
Vintage-Oaks-Cabin New Braunfels, TX
1,118 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
867 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

This site is exactly what I was looking for!!
Tino in Phoenix, AZ

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Craig in Graham, WA's Journal Entries


Click here to create your own construction journal.

Posted by Craig in Graham, WA on 2/12/2017

Well, we are making some progress...First of all we received just more the 18" of snow last Sunday, Feb 5th.  Not very common for Western Washington to get 6" of snow let alone 18". Schools were closed for 3 days, I couldn't get to work for 2 days and nothing got done on my project. By Friday, Feb 10 all the snow was just about gone and the surveyor's had been here and did there thing. Talking with the engineer he says I should have my road detail and cross sections finish by Wednesday this week. If that happens, a quick submittal to Pierce County Planning and my permit should be in hand.

I have the excavator setup for Feb. 21st, he is saying about 2 to 3 days to dig and prepare for the foundation. My foundation guy  can't start until March 10th. But I have lots to do. Including moving a water line from my well, septic pump electrical has to be moved, along with the cable/telephone lines plus moving an exterior electrical line to my heat pump and another for my emergency generator panel.  I think I will mount new the new 200 Amp panel and my new 320 Amp meter base, get the conduits installed and wire pulled to both panels. The framer is all set, I have him set up to start on March 20th. We shall see if this all comes together. 

Craig



Login to Reply




Login to comment...
Copyright 1997-2020 Consensus Group Inc.