From $9.95



Syndication

Statistics

Users
Total: 31,749
Visited Last 30 days: 91
Forum Messages
Total: 20,858
Last 30 days: 11
Forum Evaluations
Total: 24,158
Last 30 days: 0
Journal Entries
Total: 5,331
Last 30 days: 0
Connections
Total: 15,212
Last 30 days: 4
Downloads
Total: 84,116

Journals

Name
The-Last-Rodeo Angel Fire, NM
25,448 Visits | 271 Posts | 435 Pix | 4 Videos
Tanglewood Colorado Springs, CO
115,972 Visits | 971 Posts | 2,515 Pix | 42 Videos
E2custom
179 Visits | 4 Posts | 10 Pix | 0 Videos
draingrepairsnj
217 Visits | 1 Posts | 1 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
49,443 Visits | 44 Posts | 193 Pix | 0 Videos
medicareinsurance
258 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
231 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
251 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,897 Visits | 34 Posts | 52 Pix | 0 Videos
Vintage-Oaks-Cabin New Braunfels, TX
631 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
398 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
1,156 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
433 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
455 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
460 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
477 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
487 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,248 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
534 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
453 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Sally0.001

I have just discovered this site and fell in love with it. We are excited about starting the building process and having this resource will be very helpful.
Cynthia in Ladson, SC

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 1/31/2017

We've been making good progress on the electric.  All of the runs on the second level were finished today, and Sandra has cut on and foamed nearly all of the receptacle boxes into the ICFs on both the second and third floors. Only, a few short runs on the third floor to do, but I need to finally finish the elevator shaft on that floor in order to do that.  I spent yesterday working on that, but have a bit more to do.  And I need to set the boxes for the lights in the great room.  That's going to take setting up scaffolding to get up to the 20' height. That's going to be a bit of a pain and take some time.  Ugh.


Photos

Not pretty, but will trim the orange foam before sheetrock goes on. When working with ICFs, you have to cut out the foam to run the electric and set boxes. It's a royal pain. The biggest issue is the depth of the foam that most manufacturers use is 2 1/2" to 2 5/8". Most electric boxes are deeper than that. Close but deeper. Have to search for boxes that fit best and then sometimes still have to chisel out of concrete beyond to get the box to fit. The flap on the box is screwed to a plastic web that is inbedded in the foam. Wires are inserted, you spray foam box to the wall. Turns out rock solid in the end. But still a pain.
Close up of the box setting



Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.