From $9.95



Syndication

Statistics

Users
Total: 30,955
Visited Last 30 days: 167
Forum Messages
Total: 20,752
Last 30 days: 6
Forum Evaluations
Total: 24,153
Last 30 days: 0
Journal Entries
Total: 5,271
Last 30 days: 6
Connections
Total: 15,157
Last 30 days: 7
Downloads
Total: 82,113

Journals

Name
The-Last-Rodeo Angel Fire, NM
23,558 Visits | 258 Posts | 406 Pix | 4 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
15 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
25 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
112,994 Visits | 943 Posts | 2,450 Pix | 42 Videos
Art-Camacho New Braunfels, TX
776 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
77 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
82 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,159 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
94 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
171 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
495 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
253 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
206 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
319 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
391 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,454 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,654 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
417 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
466 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
624 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


I'm very impressed by your bookstore.
Michael H., Sacramento, CA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 1/13/2017 11:20:37 PM

Should be done with this level in a couple days.  The bedrooms and baths are done except for setting boxes in the ICF walls and securing the wire using scrap foam to temporarily hold it in the channels Sandra made, while dabs of spray foam sprayed in set up.  That should be an easy chore as everything is in place.  The ski/mud room needs its lights and receptacles wired.  Those items should be done tomorrow.  Need to run the kitchen stuff, and the great room lights, all 16 of them.  So maybe a total of 3 days?

Then back upstairs to the main level and 4th floor.  Just bath fans in the 4th floor, but kitchen and great room lights on the main.  The great room will be a challenge having to rip 2x4's to create a space along the interior sub ceiling and attachment point for electrical boxes that can be used for surface mounted LEDs  after the ceiling is installed some months down the road. 3 weeks huh? Hmmm. 

Had a look on Google maps yesterday.  Was surpsrised to see the satellite image had changed quite a bit from the last one.  What was a bare plot of ground now has a structure circa early October from the stage it is in.  I took a screen shot and attached it here.n

Photos

roof decking isn't on, but the decks are being installed. Two more glulams for the decks are visible as long white things in the lower left of the site.



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.