From $9.95



Syndication

Statistics

Users
Total: 34,030
Visited Last 30 days: 169
Forum Messages
Total: 21,062
Last 30 days: 10
Forum Evaluations
Total: 24,342
Last 30 days: 0
Journal Entries
Total: 5,476
Last 30 days: 6
Connections
Total: 15,292
Last 30 days: 4
Downloads
Total: 88,954

Journals

Name
sacramento-seo-exper...
0 Visits | 2 Posts | 0 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
1,150 Visits | 10 Posts | 6 Pix | 0 Videos
First-Time-Home-Owne... Fountain Inn, SC
121 Visits | 4 Posts | 0 Pix | 0 Videos
Moving-Tips Delhi, AL
231 Visits | 3 Posts | 0 Pix | 0 Videos
jemodernllc Washington DC, WA
81 Visits | 1 Posts | 1 Pix | 0 Videos
pestcontrolservice noida, AL
119 Visits | 1 Posts | 1 Pix | 0 Videos
homeexchange Boynton Beach, FL
233 Visits | 1 Posts | 1 Pix | 0 Videos
Packers-and-Movers Delhi, AL
1,067 Visits | 7 Posts | 1 Pix | 0 Videos
tubepminhkiet Ho Chi Minh, AL
290 Visits | 1 Posts | 4 Pix | 0 Videos
thietbivesinhthienlo... Ho Chi Minh, AL
304 Visits | 1 Posts | 1 Pix | 0 Videos
songnam Ho Chi Minh, AL
281 Visits | 1 Posts | 2 Pix | 0 Videos
ridhwan New Delhi, AL
314 Visits | 2 Posts | 1 Pix | 0 Videos
RoofProIndy
328 Visits | 2 Posts | 0 Pix | 0 Videos
Concrete-Contractors...
822 Visits | 6 Posts | 0 Pix | 0 Videos
admetalroofing Morehead City, NC
318 Visits | 1 Posts | 1 Pix | 0 Videos
httpswwwtrukorcomblo... Hyderabad, AL
368 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
126,248 Visits | 1,018 Posts | 2,596 Pix | 47 Videos
Handyman
400 Visits | 1 Posts | 0 Pix | 0 Videos
Rick-Low
451 Visits | 5 Posts | 0 Pix | 0 Videos
pressure-washing-ren...
470 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

I’ve been reading posts on this forum for months and have learned a tremendous amount of info.
Chris in Chillicothe, MO

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 12/7/2016

We're making progress on getting the French doors in. With ICF construction, setting doors and windows is generally different than on a framed structure. Also add in that the dimensions of the openings during the concrete phase were sometimes off a bit, and setting the frames, getting the concrete sill chiseled to the correct height has taken a fair amount of time this week. But today we got the main level French doors, four of them to be exact, set in place! I still have to finish shimming and have some fine tuning of the hinges, but they are in, they operate very well considering they haven't been tuned yet.

Taking tomorrow off as it is opening day of skiing, but Friday, we'll set the two second floor French doors and the side door. Get hardware on and the house will be pretty secure. We still have to get the garage doors working to be able to fully lock the house, but at least it'll keep the skiers from using it as a warming hut. ;-)

The excavator backfilled the electric trench and cleaned up the area. Also had him dig two holes so we can put in posts for a driveway gate. I set form tubes, picked up some square steel channel and will try to mix concrete this weekend and set the posts. It's actually going to warm up a bit this weekend and it will be a good chance to get that done.

Photos

Great room door to the side deck. Both doors operate.
Kitchen door. This also has both doors operable for the future patio. Snow on the slope in the background.
Door leading to the deck that wraps around to the side deck



Login to Reply




Login to comment...
Copyright 1997-2021 Consensus Group Inc.