From $9.95



Syndication

Statistics

Users
Total: 30,704
Visited Last 30 days: 161
Forum Messages
Total: 20,744
Last 30 days: 10
Forum Evaluations
Total: 24,149
Last 30 days: 0
Journal Entries
Total: 5,253
Last 30 days: 13
Connections
Total: 15,145
Last 30 days: 5
Downloads
Total: 81,513

Journals

Name
The-Last-Rodeo Angel Fire, NM
22,977 Visits | 248 Posts | 373 Pix | 4 Videos
Art-Camacho New Braunfels, TX
709 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
18 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
25 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
112,304 Visits | 937 Posts | 2,439 Pix | 42 Videos
MesaBarnHouse Mesa, AZ
1,027 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
50 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
113 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
379 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
182 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
140 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
257 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
316 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,207 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,468 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
369 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
399 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
545 Visits | 1 Posts | 0 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
1,167 Visits | 3 Posts | 1 Pix | 0 Videos
Our-log-home Thomaston, GA
1,057 Visits | 2 Posts | 4 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

So glad I found this site! It is great!
Tiffany Adams

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 11/9/2016

Taking more time to set the SIPs than expected - like most everything on the house. Although the height of the house gives us tremendous views, it always makes things more difficult and slow. But, they got over the halfway point, will finish by week's end and it's looking great. Meanwhile, I finally got the window well set. Also getting the window frames sealed prior to the rest of the windows getting set next week.

Meanwhile, the stone guys are nearly finishing the first floor. Really looks good. They can begin the second floor next week.

And - the resort started making snow a couple nights ago. So while the weather has held out pretty well, the artificial stuff is getting onto the lot, making things slippery for running the equipment. Talked to the resort folks today and asked if they could move the snow maker 50 yards downhill for the next three nights. Looks like they'll do it for us. After then we shouldn't need the SkyTrak on that side of the house.

Photos

Starting the first row of SIPs
An inside look at the roof
Getting to the end of the first floor stone



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.