From $9.95



Syndication

Statistics

Users
Total: 30,692
Visited Last 30 days: 153
Forum Messages
Total: 20,742
Last 30 days: 8
Forum Evaluations
Total: 24,149
Last 30 days: 0
Journal Entries
Total: 5,251
Last 30 days: 13
Connections
Total: 15,145
Last 30 days: 5
Downloads
Total: 81,472

Journals

Name
The-Last-Rodeo Angel Fire, NM
22,955 Visits | 247 Posts | 368 Pix | 4 Videos
Quijada-project-Lake... Lake Havasu City, AZ
16 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
23 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
112,285 Visits | 937 Posts | 2,439 Pix | 42 Videos
MesaBarnHouse Mesa, AZ
1,018 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
45 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
107 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
371 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
179 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
135 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
253 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
311 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,199 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,458 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
367 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
395 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
537 Visits | 1 Posts | 0 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
1,155 Visits | 3 Posts | 1 Pix | 0 Videos
Our-log-home Thomaston, GA
1,048 Visits | 2 Posts | 4 Pix | 0 Videos
697-Marlin Austin/McDade, TX
6,478 Visits | 63 Posts | 508 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

We are new to this terrific O-B site. This is all so very helpful.
Susan in Midland, MI

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 10/30/2016

As the framers finish the roof and I have people running stone, getting doors and windows in becomes the next priority. The framer will set the remaining windows. I've begun thinking of getting things ready on the doors. Sandra is off continuing to stain the garage doors. The two smaller ones are done. She's started on the double door today. I started on setting the two single car ones. Been quite a few years since I set garage doors, and the instructions aren't the best, but they'll get done this week.

I need to give the go ahead on the French door order. They take two weeks to come in. I don't need them before the middle of the month so if I place it early this week, we should be fine.

Photos

Three panels of a single car door. I'll get one of the stone guys to help me with the fourth panel up on both.
The double door being prepped for stain
After the first coat of stain
Stone starting around the front of the staircase



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.