From $9.95



Syndication

Statistics

Users
Total: 33,060
Visited Last 30 days: 158
Forum Messages
Total: 20,988
Last 30 days: 19
Forum Evaluations
Total: 24,160
Last 30 days: 0
Journal Entries
Total: 5,418
Last 30 days: 16
Connections
Total: 15,255
Last 30 days: 4
Downloads
Total: 87,432

Journals

Name
Rick-Low
11 Visits | 5 Posts | 0 Pix | 0 Videos
pressure-washing-ren...
15 Visits | 1 Posts | 0 Pix | 0 Videos
getpestcontrol Delhi, AL
111 Visits | 4 Posts | 1 Pix | 0 Videos
Tenants-Right-When-S... Maryland, MD
681 Visits | 9 Posts | 5 Pix | 0 Videos
Dream-Home Biloxi, MS
31 Visits | 1 Posts | 0 Pix | 0 Videos
Linksys-Extender-Set...
27 Visits | 1 Posts | 0 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
68,360 Visits | 177 Posts | 525 Pix | 4 Videos
1860s-Texas-rehabnew... Boerne, TX
50,536 Visits | 45 Posts | 194 Pix | 0 Videos
Forex-Trading-For-Be...
300 Visits | 3 Posts | 0 Pix | 0 Videos
NorthShoreBathrooms
90 Visits | 1 Posts | 2 Pix | 0 Videos
furnacerepairon St Catharines, AL
96 Visits | 1 Posts | 9 Pix | 0 Videos
furnacemkm Markham, AL
96 Visits | 1 Posts | 7 Pix | 0 Videos
noithattrieugia tphcm, AL
116 Visits | 1 Posts | 0 Pix | 0 Videos
httpownerbuilderbook...
185 Visits | 1 Posts | 0 Pix | 0 Videos
Packers-and-Movers Delhi, AL
470 Visits | 2 Posts | 1 Pix | 0 Videos
Best-Access-Doors Jackson, AL
233 Visits | 1 Posts | 0 Pix | 0 Videos
bird Springfield, MO
229 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
120,942 Visits | 1,004 Posts | 2,581 Pix | 47 Videos
Drywall-Repair-Lehi
309 Visits | 1 Posts | 0 Pix | 0 Videos
ianpundt
353 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Lance in Buena Vista, CO0.002

I just found this website. It looks to be exactly what I've been looking for. There are many like-minded people here who love doing things for themselves.
Bob in Ennis, TX

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 10/30/2016

As the framers finish the roof and I have people running stone, getting doors and windows in becomes the next priority. The framer will set the remaining windows. I've begun thinking of getting things ready on the doors. Sandra is off continuing to stain the garage doors. The two smaller ones are done. She's started on the double door today. I started on setting the two single car ones. Been quite a few years since I set garage doors, and the instructions aren't the best, but they'll get done this week.

I need to give the go ahead on the French door order. They take two weeks to come in. I don't need them before the middle of the month so if I place it early this week, we should be fine.

Photos

Three panels of a single car door. I'll get one of the stone guys to help me with the fourth panel up on both.
The double door being prepped for stain
After the first coat of stain
Stone starting around the front of the staircase



Login to Reply




Login to comment...
Copyright 1997-2020 Consensus Group Inc.