From $9.95



Syndication

Statistics

Users
Total: 30,956
Visited Last 30 days: 168
Forum Messages
Total: 20,752
Last 30 days: 6
Forum Evaluations
Total: 24,153
Last 30 days: 0
Journal Entries
Total: 5,271
Last 30 days: 6
Connections
Total: 15,157
Last 30 days: 7
Downloads
Total: 82,113

Journals

Name
The-Last-Rodeo Angel Fire, NM
23,564 Visits | 258 Posts | 406 Pix | 4 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
16 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
26 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
112,997 Visits | 943 Posts | 2,450 Pix | 42 Videos
Art-Camacho New Braunfels, TX
777 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
78 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
83 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,160 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
95 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
172 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
496 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
254 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
207 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
320 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
392 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,456 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,656 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
418 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
467 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
625 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


Thanks for this website, this is GREAT resource!
Shah Ahmad

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 10/29/2016

Since setting the beams and front timber truss on Monday, the framing crew has been working on extending the overhangs on the conventional sections of roof, and beginning to tie in the front truss to the house. That latter chore has been a real pain trying to figure out the correct pitch on the shed roof sections in order to keep the gable section far enough back from a side wall to keep snow from catching and building up. They actually had to rip out the first try. It's really and issue of trying to visualize solid surfaces, when only framing exists and they are compound angles going on. But Jason finally has it started on the right path. They also have gotten the 4th level roof decked completely and the knee braces on as well.

Sandra has been staining the garage doors while the weather lasts. If it continues to hold, she could be done by mid next week. We are using a two-step stain from Sikkens that has very good UV protection. Wish we could that on the timber trusses, but trying to get three coats on them would have been tough time-wise.

Stone is progressing slower than I'd expect for two guys, but we'll continue. Finally worked out the detail of running the stone around the windows and that is looking good.

Photos

Fourth-level deck with knee braces at the corners. Slowly taking shape!



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.