From $9.95



Syndication

Statistics

Users
Total: 30,955
Visited Last 30 days: 167
Forum Messages
Total: 20,752
Last 30 days: 6
Forum Evaluations
Total: 24,153
Last 30 days: 0
Journal Entries
Total: 5,271
Last 30 days: 6
Connections
Total: 15,157
Last 30 days: 7
Downloads
Total: 82,113

Journals

Name
The-Last-Rodeo Angel Fire, NM
23,558 Visits | 258 Posts | 406 Pix | 4 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
15 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
25 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
112,994 Visits | 943 Posts | 2,450 Pix | 42 Videos
Art-Camacho New Braunfels, TX
776 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
77 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
82 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,159 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
94 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
171 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
495 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
253 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
206 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
319 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
391 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,454 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,654 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
417 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
466 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
624 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


Thanks for your awesome website, I read every day!!
Amy in Richfield, UT

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 8/23/2016

Framers are still at work on getting the exterior walls up on the fourth floor. They had gotten the two end walls up earlier. Today, they got the rear wall up, and two wing walls on the front are ready to raise. Last Friday they set the rest of the sill plates on the top of the third floor for the beams and the roof trusses that sit there. 


Sandra and I took a few days off and returned to the job site today. I had an idea to see if I could skip getting a jackhammer to break up the blowout that covered up the holes in the retaining wall. Those holes were for drainage, electric and fiber. Decided to see if I could break it up with the hammer drill I have. It took nearly all day, but I finally got it cleared and could stuff the 6" PVC drain pipe through and cleared the other three inch lines that were intact. Tomorrow I'll haul the 18-foot piece of 6" PVC up and around to the backside of the wall, connect a elbow to it and the piece that I pushed through the wall and strap it to the wall. With that in place I'm one step closer to being able to get that area backfilled. I do need to run the electric and fiber conduits. Hopefully I can get those in place this week.

Excavator Kyle has not showed up to dig the water line. Hopefully tomorrow. I think I have all of the materials to get that in place once the trench is dug.

Final electrical inspection on the meter base and disconnect took place yesterday. Waiting for the utility to place the meter and we'll have temporary electric.

Waiting on pilaster block I ordered three weeks ago. Need to get that set. Now it's going to be here on Monday. Argh! 

Waiting on another quote for the metal roofing. A lot of waiting these days. There are so many things that are in queue that things being late are going to cause problems.

Photos

Back wall of the fourth floor up



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.