From $9.95



Syndication

Statistics

Users
Total: 31,031
Visited Last 30 days: 144
Forum Messages
Total: 20,757
Last 30 days: 7
Forum Evaluations
Total: 24,153
Last 30 days: 0
Journal Entries
Total: 5,282
Last 30 days: 8
Connections
Total: 15,159
Last 30 days: 3
Downloads
Total: 82,292

Journals

Name
The-Last-Rodeo Angel Fire, NM
23,758 Visits | 262 Posts | 412 Pix | 4 Videos
Geosynthetic-Systems
8 Visits | 1 Posts | 1 Pix | 0 Videos
Tanglewood Colorado Springs, CO
113,222 Visits | 947 Posts | 2,457 Pix | 42 Videos
vanphuccity Ho Chi Minh, AL
24 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
49 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
56 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
816 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
107 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
112 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,226 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
123 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
205 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
546 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
290 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
235 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
349 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
430 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,530 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,738 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
442 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


Just recently bumped into your site. I love it!
Mary in WA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 7/26/2016

Well, monsoon season, which generally arrives at the beginning of July, had held off until this week. While the rain is welcome from a general perspective, it has been playing havoc with building. Normally monsoons in the southwest mean decent weather until around mid-afternoon when the skies open up for 30 minutes and then move on. But that 30 minutes kills the rest of the day's work and makes for sloppy conditions.


The framing crew set and leveled the sole plate and started laying out and setting the floor trusses. As for the last floor, we are running plumbing and HVAC ducts through the trusses and thus must lay in pipe and ducts as the trusses are set. Making sure I have everything in there before they are all in is extremely important. 

With Howard's help today, we finally finished the waterproofing and water screen. Backfilling can proceed for all except where a retaining wall sits against the front wall at one corner. And with his help we got the basement section of the elevator shaft finished. Hopefully we can get the second level shaft done before he leaves later this week.

Photos

Framer Jason hauling a load of floor trusses up the ski slope. Really the only way to get them up to the level we are at.
Skytrak following the load of trusses up so it can offload them
Second set of trusses (for the third floor) being set today. As Concrete John held dimensions better during the pour, they are slipping right in as they should.



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.