From $9.95



Syndication

Statistics

Users
Total: 31,336
Visited Last 30 days: 157
Forum Messages
Total: 20,804
Last 30 days: 15
Forum Evaluations
Total: 24,154
Last 30 days: 0
Journal Entries
Total: 5,309
Last 30 days: 1
Connections
Total: 15,181
Last 30 days: 13
Downloads
Total: 83,087

Journals

Name
MesaBarnHouse Mesa, AZ
1,523 Visits | 34 Posts | 52 Pix | 0 Videos
Tanglewood Colorado Springs, CO
114,457 Visits | 961 Posts | 2,500 Pix | 42 Videos
The-Last-Rodeo Angel Fire, NM
24,638 Visits | 269 Posts | 433 Pix | 4 Videos
Vintage-Oaks-Cabin New Braunfels, TX
387 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
127 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
859 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
186 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
178 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
209 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
227 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
256 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
999 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
295 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
266 Visits | 1 Posts | 0 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
285 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
367 Visits | 1 Posts | 0 Pix | 0 Videos
Metal-Buildings Conroe, TX
503 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
474 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
527 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
619 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

Wow! New speed of the site is amazing. There is tons of information here and now it is available as fast as I can click on the links!
Bryan in San Jose, CA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 6/29/2016

Boy they were moving today! But it was amazing how many details needed finishing. Two outside corners needed to be braced, five long lintels needed to be made up, finishing of attaching one-sided blocks and lots of bracing yet. When I was last up there at 3:00 pm, they were planning on working till 7:00, but shortly afterwards a rainstorm came through. Storms normally only last an hour or so here in the summer, and true to form, this one did as well, but I'm not sure they went back afterwards. Concrete is scheduled for 9:00 am. That gives them three hours to finish it off. I still need to place a couple of pipes in the walls. Got most of them done today, but lost access to the scaffold ladder as the crew continued at a feverish pace. I'll get there at 6:00 to make sure I get them in.


Waterproofing membranes, weep screed and roof underlayment I ordered from Canada arrived today, four pallets of material. So we'll be good to go on getting that (not the roof underlayment) on as soon as the exterior braces are taken off around the 12th, which happens to be when my son-in-law (Muton Busting house) and brother-in-law arrive for two weeks of help! I know what they will be doing!


Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.