From $9.95



Syndication

Statistics

Users
Total: 30,606
Visited Last 30 days: 176
Forum Messages
Total: 20,738
Last 30 days: 26
Forum Evaluations
Total: 24,149
Last 30 days: 1
Journal Entries
Total: 5,240
Last 30 days: 16
Connections
Total: 15,142
Last 30 days: 5
Downloads
Total: 81,207

Journals

Name
Tanglewood Colorado Springs, CO
112,108 Visits | 934 Posts | 2,433 Pix | 42 Videos
The-Last-Rodeo Angel Fire, NM
22,734 Visits | 242 Posts | 361 Pix | 4 Videos
LalcoInteriors1 Mumbai, AL
17 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
965 Visits | 32 Posts | 46 Pix | 0 Videos
Stan-Tol Winter Springs, FL
85 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
328 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
143 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
106 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
221 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
286 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,145 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,376 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
345 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
372 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
509 Visits | 1 Posts | 0 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
1,104 Visits | 3 Posts | 1 Pix | 0 Videos
Our-log-home Thomaston, GA
1,010 Visits | 2 Posts | 4 Pix | 0 Videos
697-Marlin Austin/McDade, TX
6,411 Visits | 63 Posts | 508 Pix | 0 Videos
skiddinginbroadside Livermore, AL
915 Visits | 1 Posts | 0 Pix | 0 Videos
thedaniels Graham, WA
969 Visits | 5 Posts | 5 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

This is a great site with tons and tons of resources.
Matt in Minco, OK

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Stan in Knoxville, TN's Journal Entries


Click here to create your own construction journal.

Posted by Stan in Knoxville, TN on 11/18/2006

This photo is after only four days of framing, one of which was raining off and on. They were so fast the lumberyard had a hard time keeping up. The entire house package was on site by the fourth day. They tell me three-four more days it will be completely under roof, all stick built.

Photos




Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.