From $9.95



Syndication

Statistics

Users
Total: 30,826
Visited Last 30 days: 170
Forum Messages
Total: 20,746
Last 30 days: 4
Forum Evaluations
Total: 24,153
Last 30 days: 4
Journal Entries
Total: 5,266
Last 30 days: 13
Connections
Total: 15,150
Last 30 days: 5
Downloads
Total: 81,692

Journals

Name
The-Last-Rodeo Angel Fire, NM
23,215 Visits | 252 Posts | 384 Pix | 4 Videos
Car-Rentals-in-Udaip... Delhi, AL
4 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
112,614 Visits | 943 Posts | 2,450 Pix | 42 Videos
Art-Camacho New Braunfels, TX
753 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
57 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
56 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,103 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
73 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
142 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
444 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
219 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
171 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
287 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
355 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,297 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,565 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
394 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
428 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
583 Visits | 1 Posts | 0 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
1,227 Visits | 3 Posts | 1 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


I look forward to more responses. This site is chock-full of good info.
Kerry in Newport News, VA

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 6/22/2016

Concrete John's crew started this morning stripping forms and setting the ICFs around the slab. Afterwards, they started setting them up. And they moved! By the end of the day, they had nearly the entire first floor up and braced. One row short from the top and nothing for the staircase yet, but man it looks impressive!


They'll return tomorrow to continue. I need to mark locations for the elevator shaft so we can set anchors for those walls to the ICFs. Then construct the walls after the next pour. We also will set anchors for walls to create a large store room to the left side of the floor. Pour the ICF walls, all 14' tall, next Thursday or Friday in 4' lifts. Starting at one end, they pour the lift rotating around the entire wall. Then pour the the next and the next. A total of 120 yards on this level because of the 12" thick concrete core. Will take about four hours to accomplish. But that's next week.

Larry in Angel Fire, NM

Photos

Shot across half the front. The stairwell walls have not yet been set. A double car door on the far end.
Right half, two single garage doors.
Wow! Another foot and a half yet to add onto the height. This sucker is tall!
View from above



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.