From $9.95



Syndication

Statistics

Users
Total: 31,443
Visited Last 30 days: 153
Forum Messages
Total: 20,824
Last 30 days: 21
Forum Evaluations
Total: 24,155
Last 30 days: 1
Journal Entries
Total: 5,316
Last 30 days: 8
Connections
Total: 15,187
Last 30 days: 5
Downloads
Total: 83,455

Journals

Name
1860s-Texas-rehabnew... Boerne, TX
49,109 Visits | 44 Posts | 193 Pix | 0 Videos
duomit Rahway, NJ
19 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
114,782 Visits | 964 Posts | 2,503 Pix | 42 Videos
medicareinsurance
41 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
33 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
47 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,601 Visits | 34 Posts | 52 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
24,818 Visits | 269 Posts | 433 Pix | 4 Videos
Vintage-Oaks-Cabin New Braunfels, TX
437 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
189 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
911 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
226 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
259 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
267 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
286 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
291 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,055 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
335 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
314 Visits | 1 Posts | 0 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
339 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

I have been diligently reading The O-B Book. I'm about halfway through, and it helps me gain the confidence to become an owner-builder.
Sandra in Apache Junction, AZ

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Angel Fire, NM's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Angel Fire, NM on 5/21/2016

Excavator called mid afternoon. Said he needs to rent some larger equipment. He had gotten through the topsoil and was having difficulty in getting through the shale very quickly. I had been surprised originally that he didn't have big equipment up there. So he finished what he was doing and will be back Monday with a track hoe.


By Friday evening, still have not gotten finals from the engineer. No response to emails or a VM. FRUSTRATING! I called the concrete contractor in Santa Fe and let them know, but I also committed to them based on the estimate he had given me this week, understanding that the price could go up a bit. Maybe not a smart idea, but he had limited the increase to 10%, and didn't think it would be that much. Will know better once we HAVE THE ENGINEERING! But the big thing is to get him a commitment so we can get on his schedule. What we have to keep in mind is that there is a short build season here. We want to get dried in by winter. He is looking at starting in mid June. That's only about three weeks away! Yeah!


Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.