Finished all the railing including the lower section so I've called in for the final. Should happen before Thanksgiving. Crossing my fingers.
Todd's finishing up the bookshelves, Cassidy has painted them and started filling them up. Just the crown left on top and that'll get done today.
I think I've finally figured out the issue with blowing fuses on the HVAC. When the AC was on it was an intermittent problem so really impossible to diagnose. When switching to heat, it is a constant and immediate condition. By jumping power to the various functions - fan, call for heat, I was able to get the furnace to fire normally. Ultimately, I've narrowed down to my mistake in connecting an additional wire into the thermostat. Why that would cause an intermittent problem under AC, I don't get, but I'll remove that wire today and see if everything fires OK. Hoping it does, as it was 25
F today. The fireplaces keep up very well, but it's definitely time to get everything working.
Will try to get the old log mantels set today as well. That leaves hanging the laundry door left as the last big thing to do. I feel good that we're on track to be done before we leave for Angel Fire.
Login to Reply