Yesterday and today, before Howard got on a plane back to Texas, we continued to set cabinets. Did the island yesterday. What seemed like a simple process, took the entire day as the shimming process was long and arduous. And 3/4 of the way through, we found that the starting point had rotated through some strange event and the second side we took off from it was incorrect. Neither of us can figure it out as it was screwed down when set in place. Today we set the cabinet above the fridge, made a wall for the right side and set it, and also set the farm sink and microwave in its drawer. Have to run water to the sink cabinet, and electrical to the microwave, disposal, dishwasher and small tankless, but that's it. Should get all of that run this weekend, as wiring is underneath the floor, while we wait for the counters to show up possibly next week (Stone guy is coming in the morning to measure, now that everything is ready for him).
Waiting for the final gas inspection. Was asked to take place Tuesday, but called them today after a no show and he said he might get to it by Friday.
Photos
|
Stove wall complete, except for painting the wall that is just right of the fridge. Also need to put in a small filler to cover the small space between it and the other cabinets. Sink is to the lower right. It's huge! Whoops, forgot that crown moulding still goes on. |
|
|
Shot of the island with the sink and dishwasher. The dishwasher gets a cabinet panel for the front. Got to look how to attach it. |
|
|
Microwave in its drawer. Sits across from the stove. |
| |