From $9.95



Syndication

Statistics

Users
Total: 30,961
Visited Last 30 days: 169
Forum Messages
Total: 20,752
Last 30 days: 6
Forum Evaluations
Total: 24,153
Last 30 days: 0
Journal Entries
Total: 5,272
Last 30 days: 6
Connections
Total: 15,157
Last 30 days: 7
Downloads
Total: 82,130

Journals

Name
The-Last-Rodeo Angel Fire, NM
23,568 Visits | 259 Posts | 409 Pix | 4 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
16 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
26 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
113,003 Visits | 943 Posts | 2,450 Pix | 42 Videos
Art-Camacho New Braunfels, TX
778 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
79 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
83 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,163 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
95 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
172 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
497 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
255 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
207 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
320 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
392 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,458 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,656 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
418 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
468 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
627 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


I really appreciate the info I get from this site.
Kevin from Gilbert, AZ

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Nashville, TN's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Nashville, TN on 7/7/2015

A few posts back, I commiserated about the upper AC not working out as planned. As the house has dried out some from all the moisture we put in with the painting a few weeks ago, the upper AC has improved some. Could be the very heavy humidity was sucking a lot of the cooling, at ~1,000 BTUs/lb of water. And we've been tightening up a number of drafts that I know we're letting hot air in or cold air out. Still have to create doors for the access hatches and I know they are letting air in, but overall, the system is working better. I have decided to add an additional outlet in the master bedroom and add a second return in the ceiling of the hall to better draw hot air.


As part of my tightening up, I reset the attic stairs and foamed around the frame today. I had originally set them before we decided to fur the ceiling, so they weren't flush with the sheet rock. Been something that needed to be done, so at five this morning, went over before the attic heated up. Got the trim on it and with the ceiling grills over the vents and ceiling fans put up yesterday, the upstairs is coming along.

Got the guest and first floor shower floors laid. Stainless steel penny tile. I think it looks a little too Vegas, but the girls are in love with it. Need to tile the curbs after Sandra grouts the floor. The correct penny tile for the master will be in this Friday, and will get that done over the weekend.

Photos

Guest shower floor laid in stainless steel penny tile. Should finish at least two of the showers this coming weekend. The third, after vacation and then order glass.
Laying the first floor shower floor.
Also got a chandelier, sans shade, hung today in the stairwell.



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.